Life Cycle Cost (LCC) is an economic assessment technique that produces outputs, which will give useful cost information to many including clients, estimators and researchers in facilitating them to make better decision in the process of determining the most optimum total costs of an asset, such as...

Full description

Bibliographic Details
Main Authors: Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin
Format: Proceeding Paper
Language:English
English
Published: 2014
Subjects:
Online Access:http://irep.iium.edu.my/37736/1/302_rev2_PDF.pdf
http://irep.iium.edu.my/37736/4/IRIIE_2014-_Book_of_Abstracts_%283%29.pdf
_version_ 1796878924450365440
author Ayob, Mohd Fairullazi
Abdul Rashid, Khairuddin
author_facet Ayob, Mohd Fairullazi
Abdul Rashid, Khairuddin
author_sort Ayob, Mohd Fairullazi
collection IIUM
description Life Cycle Cost (LCC) is an economic assessment technique that produces outputs, which will give useful cost information to many including clients, estimators and researchers in facilitating them to make better decision in the process of determining the most optimum total costs of an asset, such as a building, over an anticipated life or in comparing the most cost-effective of mutually exclusive alternatives. Past studies have confirmed that quality, currency and adequacy of cost data used as inputs as well as the method used for the LCC analysis are of paramount importance in effort to produce reliable LCC outputs. There are different kinds of data to be used as inputs in LCC analysis and the type of data to be used is contingent upon the intended output of the LCC analysis. In the current research the focus is on cost data inputs for buildings’ LCC. The objective of the poster is to present the outcome of a study to identify the types of cost data as inputs requirements for a comprehensive LCC estimation for building works in the Malaysian construction industry. The study being reported herein is drawn from a three-year programme of research to purposely enhance the quality of LCC outputs for building projects in Malaysia. The methodology employed for the study comprised comprehensive review of related literature and three rounds of modified Delphi. The participants that completed all three rounds of modified Delphi questionnaire were 20 experts on LCC in Malaysia. The key findings of the study include that in the context of Malaysia (i) the major hurdle of conducting LCC analysis is somewhat homogeneous: lack of reliable, accurate, and current cost data inputs; (ii) quality of data input requirements for producing reliable LCC outputs should possess the following characteristics: availability, accessibility, currency and reliability of cost data; (iii) a total of 35 types of cost data requirements for producing reliable LCC outputs that are available and accessible have been identified; and (iv) 5 formulas have been identified that could be employed to facilitate the LCC estimators to update the historical data for producing reliable LCC outputs. The outcome of the study is considered significant in effort to assist clients, estimators and researchers to make better decision in terms of determining the most optimum total costs of an asset and to help reject the common belief that cost of an asset only comprised of the capital costs and that the lowest capital cost is the best.
first_indexed 2024-03-05T23:28:21Z
format Proceeding Paper
id oai:generic.eprints.org:37736
institution International Islamic University Malaysia
language English
English
last_indexed 2024-03-05T23:28:21Z
publishDate 2014
record_format dspace
spelling oai:generic.eprints.org:377362021-07-19T09:03:24Z http://irep.iium.edu.my/37736/ Identification of cost data input in life cycle cost (LCC) for building projects Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin TH Building construction TH4021 Buildings. Construction with reference to use. Life Cycle Cost (LCC) is an economic assessment technique that produces outputs, which will give useful cost information to many including clients, estimators and researchers in facilitating them to make better decision in the process of determining the most optimum total costs of an asset, such as a building, over an anticipated life or in comparing the most cost-effective of mutually exclusive alternatives. Past studies have confirmed that quality, currency and adequacy of cost data used as inputs as well as the method used for the LCC analysis are of paramount importance in effort to produce reliable LCC outputs. There are different kinds of data to be used as inputs in LCC analysis and the type of data to be used is contingent upon the intended output of the LCC analysis. In the current research the focus is on cost data inputs for buildings’ LCC. The objective of the poster is to present the outcome of a study to identify the types of cost data as inputs requirements for a comprehensive LCC estimation for building works in the Malaysian construction industry. The study being reported herein is drawn from a three-year programme of research to purposely enhance the quality of LCC outputs for building projects in Malaysia. The methodology employed for the study comprised comprehensive review of related literature and three rounds of modified Delphi. The participants that completed all three rounds of modified Delphi questionnaire were 20 experts on LCC in Malaysia. The key findings of the study include that in the context of Malaysia (i) the major hurdle of conducting LCC analysis is somewhat homogeneous: lack of reliable, accurate, and current cost data inputs; (ii) quality of data input requirements for producing reliable LCC outputs should possess the following characteristics: availability, accessibility, currency and reliability of cost data; (iii) a total of 35 types of cost data requirements for producing reliable LCC outputs that are available and accessible have been identified; and (iv) 5 formulas have been identified that could be employed to facilitate the LCC estimators to update the historical data for producing reliable LCC outputs. The outcome of the study is considered significant in effort to assist clients, estimators and researchers to make better decision in terms of determining the most optimum total costs of an asset and to help reject the common belief that cost of an asset only comprised of the capital costs and that the lowest capital cost is the best. 2014-06-11 Proceeding Paper PeerReviewed application/pdf en http://irep.iium.edu.my/37736/1/302_rev2_PDF.pdf application/pdf en http://irep.iium.edu.my/37736/4/IRIIE_2014-_Book_of_Abstracts_%283%29.pdf Ayob, Mohd Fairullazi and Abdul Rashid, Khairuddin (2014) Identification of cost data input in life cycle cost (LCC) for building projects. In: International Research Invention & Innovation Exhibition for 2014 (IRIIE 2014), 11-13 June 2014, Gombak, Kuala Lumpur. http://www.iium.edu.my/irie/14/
spellingShingle TH Building construction
TH4021 Buildings. Construction with reference to use.
Ayob, Mohd Fairullazi
Abdul Rashid, Khairuddin
Identification of cost data input in life cycle cost (LCC) for building projects
title Identification of cost data input in life cycle cost (LCC) for building projects
title_full Identification of cost data input in life cycle cost (LCC) for building projects
title_fullStr Identification of cost data input in life cycle cost (LCC) for building projects
title_full_unstemmed Identification of cost data input in life cycle cost (LCC) for building projects
title_short Identification of cost data input in life cycle cost (LCC) for building projects
title_sort identification of cost data input in life cycle cost lcc for building projects
topic TH Building construction
TH4021 Buildings. Construction with reference to use.
url http://irep.iium.edu.my/37736/1/302_rev2_PDF.pdf
http://irep.iium.edu.my/37736/4/IRIIE_2014-_Book_of_Abstracts_%283%29.pdf
work_keys_str_mv AT ayobmohdfairullazi identificationofcostdatainputinlifecyclecostlccforbuildingprojects
AT abdulrashidkhairuddin identificationofcostdatainputinlifecyclecostlccforbuildingprojects