Peningkatan Nilai PCN Landasan Pacu Bandar Udara Ahmad Yani Semarang

Development of transport sector carried out in order to achieve an orderly transportation system, orderly, safe, smooth, fast, efficient and costs are affordable by the public. Ahmad Yani Airport in Semarang is part of the airports in Indonesia is getting the attention of government to be developed...

Full description

Bibliographic Details
Main Authors: , EBEN HAEZER, , Ir. Djoko Murwono, M.Sc.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
Description
Summary:Development of transport sector carried out in order to achieve an orderly transportation system, orderly, safe, smooth, fast, efficient and costs are affordable by the public. Ahmad Yani Airport in Semarang is part of the airports in Indonesia is getting the attention of government to be developed to meet the demand for air transportation services continue to rise quite rapidly. Ahmad Yani Airport in Semarang has a 2680 meter long runway is implemented in stages according to the demands and needs of the existing policy at that time. With the gradual development and extension of the runway causing the strength along the runway is not the same. In an effort to realize the implementation of a safe and smooth flight at Ahmad Yani Airport in Semarang, in relation to extension have been implemented in stages, to do research / study indepth on the ability of the carrying capacity of the air side facilities, in order to obtain certainty and confidence in his ability for operational larger aircraft. The study was conducted by analyzing secondary data, including data of aircraft and pavement history data. Age predicted plans for the next 20 years for pavement modeling done by the approach and to analyze the movement of aircraft on the FAA method. Research shows that to increase the value of PCN on the runway Ahmad Yani airport in Semarang needed additional layer or overlay pavement on the first 11 cm thick. It is because the PCN on the condition of 37 F / D / X / T while the value of PCN is required for the layana 20 years is of 39 F / D / X / T. while for other conditions not necessary to improve