EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN

Evaluation of short circuit current after reconfiguration for feeder 2 substation Srondol is essential for examining the protection system of the network whether it is adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the maximum short circuit current close to the Sro...

Full description

Bibliographic Details
Main Authors: , Adi Wasono, , Dr. Ir. Sasongko PH, DEA
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2011
Subjects:
ETD
_version_ 1826043657133752320
author , Adi Wasono
, Dr. Ir. Sasongko PH, DEA
author_facet , Adi Wasono
, Dr. Ir. Sasongko PH, DEA
author_sort , Adi Wasono
collection UGM
description Evaluation of short circuit current after reconfiguration for feeder 2 substation Srondol is essential for examining the protection system of the network whether it is adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the maximum short circuit current close to the Srondol substation did not change i.e. 8472 A, but the short circuit current phase to ground at the end of the feeder was decreased from 2793 A to 1786 A. There was no change on maximum short circuit current close to the feeder 2 Srondol substation after reconfiguration, therefore the circuit breaker is still adequated, however the minimum short circuit current fase to earth fault is less than the setting of OCR for instataneous element i.e. 2100A, while the short circuit current phase to ground fault at the end of feeder is 1786 A, therefore the setting of OCR have to be changed to 1786 A. The total clearing time of fuse of lateral feeder 2 Srondol substation is faster the operation time of PMT placed in Srondol substation, therefor the koordination between fuse and PMT is achieved.
first_indexed 2024-03-13T22:07:13Z
format Thesis
id oai:generic.eprints.org:89427
institution Universiti Gadjah Mada
last_indexed 2024-03-13T22:07:13Z
publishDate 2011
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:894272014-08-20T02:50:07Z https://repository.ugm.ac.id/89427/ EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN , Adi Wasono , Dr. Ir. Sasongko PH, DEA ETD Evaluation of short circuit current after reconfiguration for feeder 2 substation Srondol is essential for examining the protection system of the network whether it is adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the maximum short circuit current close to the Srondol substation did not change i.e. 8472 A, but the short circuit current phase to ground at the end of the feeder was decreased from 2793 A to 1786 A. There was no change on maximum short circuit current close to the feeder 2 Srondol substation after reconfiguration, therefore the circuit breaker is still adequated, however the minimum short circuit current fase to earth fault is less than the setting of OCR for instataneous element i.e. 2100A, while the short circuit current phase to ground fault at the end of feeder is 1786 A, therefore the setting of OCR have to be changed to 1786 A. The total clearing time of fuse of lateral feeder 2 Srondol substation is faster the operation time of PMT placed in Srondol substation, therefor the koordination between fuse and PMT is achieved. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Adi Wasono and , Dr. Ir. Sasongko PH, DEA (2011) EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51443
spellingShingle ETD
, Adi Wasono
, Dr. Ir. Sasongko PH, DEA
EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title_full EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title_fullStr EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title_full_unstemmed EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title_short EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
title_sort evaluasi koordinasi proteksi pasca rekonfigurasi jaringan distribusi tenaga listrik pt pln persero upj semarang selatan
topic ETD
work_keys_str_mv AT adiwasono evaluasikoordinasiproteksipascarekonfigurasijaringandistribusitenagalistrikptplnperseroupjsemarangselatan
AT drirsasongkophdea evaluasikoordinasiproteksipascarekonfigurasijaringandistribusitenagalistrikptplnperseroupjsemarangselatan