EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN
Evaluation of short circuit current after reconfiguration for feeder 2 substation Srondol is essential for examining the protection system of the network whether it is adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the maximum short circuit current close to the Sro...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: |
_version_ | 1826043657133752320 |
---|---|
author | , Adi Wasono , Dr. Ir. Sasongko PH, DEA |
author_facet | , Adi Wasono , Dr. Ir. Sasongko PH, DEA |
author_sort | , Adi Wasono |
collection | UGM |
description | Evaluation of short circuit current after reconfiguration for feeder 2 substation
Srondol is essential for examining the protection system of the network whether it is
adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the
maximum short circuit current close to the Srondol substation did not change i.e.
8472 A, but the short circuit current phase to ground at the end of the feeder was
decreased from 2793 A to 1786 A.
There was no change on maximum short circuit current close to the feeder 2
Srondol substation after reconfiguration, therefore the circuit breaker is still
adequated, however the minimum short circuit current fase to earth fault is less than
the setting of OCR for instataneous element i.e. 2100A, while the short circuit
current phase to ground fault at the end of feeder is 1786 A, therefore the setting of
OCR have to be changed to 1786 A.
The total clearing time of fuse of lateral feeder 2 Srondol substation is faster
the operation time of PMT placed in Srondol substation, therefor the koordination
between fuse and PMT is achieved. |
first_indexed | 2024-03-13T22:07:13Z |
format | Thesis |
id | oai:generic.eprints.org:89427 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T22:07:13Z |
publishDate | 2011 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:894272014-08-20T02:50:07Z https://repository.ugm.ac.id/89427/ EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN , Adi Wasono , Dr. Ir. Sasongko PH, DEA ETD Evaluation of short circuit current after reconfiguration for feeder 2 substation Srondol is essential for examining the protection system of the network whether it is adequated or not. For the case of reconfiguration of feeder 2 Srondol substation, the maximum short circuit current close to the Srondol substation did not change i.e. 8472 A, but the short circuit current phase to ground at the end of the feeder was decreased from 2793 A to 1786 A. There was no change on maximum short circuit current close to the feeder 2 Srondol substation after reconfiguration, therefore the circuit breaker is still adequated, however the minimum short circuit current fase to earth fault is less than the setting of OCR for instataneous element i.e. 2100A, while the short circuit current phase to ground fault at the end of feeder is 1786 A, therefore the setting of OCR have to be changed to 1786 A. The total clearing time of fuse of lateral feeder 2 Srondol substation is faster the operation time of PMT placed in Srondol substation, therefor the koordination between fuse and PMT is achieved. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Adi Wasono and , Dr. Ir. Sasongko PH, DEA (2011) EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=51443 |
spellingShingle | ETD , Adi Wasono , Dr. Ir. Sasongko PH, DEA EVALUASI KOORDINASI PROTEKSI PASCA REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title | EVALUASI KOORDINASI PROTEKSI PASCA
REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK
PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title_full | EVALUASI KOORDINASI PROTEKSI PASCA
REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK
PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title_fullStr | EVALUASI KOORDINASI PROTEKSI PASCA
REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK
PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title_full_unstemmed | EVALUASI KOORDINASI PROTEKSI PASCA
REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK
PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title_short | EVALUASI KOORDINASI PROTEKSI PASCA
REKONFIGURASI JARINGAN DISTRIBUSI TENAGA LISTRIK
PT. PLN (PERSERO) UPJ SEMARANG SELATAN |
title_sort | evaluasi koordinasi proteksi pasca rekonfigurasi jaringan distribusi tenaga listrik pt pln persero upj semarang selatan |
topic | ETD |
work_keys_str_mv | AT adiwasono evaluasikoordinasiproteksipascarekonfigurasijaringandistribusitenagalistrikptplnperseroupjsemarangselatan AT drirsasongkophdea evaluasikoordinasiproteksipascarekonfigurasijaringandistribusitenagalistrikptplnperseroupjsemarangselatan |