PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT PROVINSI NUSA TENGGARA TIMUR, 2011
This research is intent on estimating street park (plantation a long side the roads) values of Frans Nala road in Western Manggarai Regency by cost method and determining the good planning mechanism in the street park making. It is a qualitative research which had been held on 2011 with sample data...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2011
|
Subjects: |
_version_ | 1826043929161629696 |
---|---|
author | , Florianus Riyan Gampar , Dr. Soeratno, M.Ec., |
author_facet | , Florianus Riyan Gampar , Dr. Soeratno, M.Ec., |
author_sort | , Florianus Riyan Gampar |
collection | UGM |
description | This research is intent on estimating street park (plantation a long side the
roads) values of Frans Nala road in Western Manggarai Regency by cost method
and determining the good planning mechanism in the street park making. It is a
qualitative research which had been held on 2011 with sample data taken from
General Expenditure Budget Planning at program compiling process on 2008,
compared with unit price circulated recently in 2011.
In order to achieve the objectives of this research, the appropriate planning
mechanism is needed, therefore the street park can be developed according
implementation and technical guidelines regulated by Central Government
through Specific Allocation Fund, whose calculation using Reproduction Cost
New (RCN) estimation and reduced by depreciation occurred on Street Park. The
relationship among independent variables can be observed by calculating the land
value, data of Tax Object Sales Value, expenditure for supply of plant seedlings,
and correction factors of plants after planting process on Street Park. Then, the
results of analysis show that planning mechanism and street park valuation using
DRC method can assist government of Western Manggarai Regency, especially
State Environmental Agency of Western Manggarai Regency, in composing
Regional Work Unit balance sheet. The result of DRC calculation is Rp
48,112,232,269. |
first_indexed | 2024-03-13T22:11:31Z |
format | Thesis |
id | oai:generic.eprints.org:90775 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T22:11:31Z |
publishDate | 2011 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:907752014-08-20T02:51:31Z https://repository.ugm.ac.id/90775/ PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT PROVINSI NUSA TENGGARA TIMUR, 2011 , Florianus Riyan Gampar , Dr. Soeratno, M.Ec., ETD This research is intent on estimating street park (plantation a long side the roads) values of Frans Nala road in Western Manggarai Regency by cost method and determining the good planning mechanism in the street park making. It is a qualitative research which had been held on 2011 with sample data taken from General Expenditure Budget Planning at program compiling process on 2008, compared with unit price circulated recently in 2011. In order to achieve the objectives of this research, the appropriate planning mechanism is needed, therefore the street park can be developed according implementation and technical guidelines regulated by Central Government through Specific Allocation Fund, whose calculation using Reproduction Cost New (RCN) estimation and reduced by depreciation occurred on Street Park. The relationship among independent variables can be observed by calculating the land value, data of Tax Object Sales Value, expenditure for supply of plant seedlings, and correction factors of plants after planting process on Street Park. Then, the results of analysis show that planning mechanism and street park valuation using DRC method can assist government of Western Manggarai Regency, especially State Environmental Agency of Western Manggarai Regency, in composing Regional Work Unit balance sheet. The result of DRC calculation is Rp 48,112,232,269. [Yogyakarta] : Universitas Gadjah Mada 2011 Thesis NonPeerReviewed , Florianus Riyan Gampar and , Dr. Soeratno, M.Ec., (2011) PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT PROVINSI NUSA TENGGARA TIMUR, 2011. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=52870 |
spellingShingle | ETD , Florianus Riyan Gampar , Dr. Soeratno, M.Ec., PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT PROVINSI NUSA TENGGARA TIMUR, 2011 |
title | PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN
PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT
PROVINSI NUSA TENGGARA TIMUR, 2011 |
title_full | PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN
PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT
PROVINSI NUSA TENGGARA TIMUR, 2011 |
title_fullStr | PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN
PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT
PROVINSI NUSA TENGGARA TIMUR, 2011 |
title_full_unstemmed | PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN
PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT
PROVINSI NUSA TENGGARA TIMUR, 2011 |
title_short | PENILAIAN DAN MEKANISME PERENCANAAN TURUS JALAN
PADA RUAS JALAN FRANS NALA KABUPATEN MANGGARAI BARAT
PROVINSI NUSA TENGGARA TIMUR, 2011 |
title_sort | penilaian dan mekanisme perencanaan turus jalan pada ruas jalan frans nala kabupaten manggarai barat provinsi nusa tenggara timur 2011 |
topic | ETD |
work_keys_str_mv | AT florianusriyangampar penilaiandanmekanismeperencanaanturusjalanpadaruasjalanfransnalakabupatenmanggaraibaratprovinsinusatenggaratimur2011 AT drsoeratnomec penilaiandanmekanismeperencanaanturusjalanpadaruasjalanfransnalakabupatenmanggaraibaratprovinsinusatenggaratimur2011 |