PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)

This study aims to map the problems associated with building projects and mapping solutions APBNP of the implementation process in building construction work associated with APBNP. In addition this study wanted to find and establish the factors that affect product satisfaction in building constructi...

Full description

Bibliographic Details
Main Authors: , Dimas Hastama Nugraha, , Arief Setiawan Budi N, S.T,M.Eng, Ph.D
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2012
Subjects:
ETD
_version_ 1797032158957666304
author , Dimas Hastama Nugraha
, Arief Setiawan Budi N, S.T,M.Eng, Ph.D
author_facet , Dimas Hastama Nugraha
, Arief Setiawan Budi N, S.T,M.Eng, Ph.D
author_sort , Dimas Hastama Nugraha
collection UGM
description This study aims to map the problems associated with building projects and mapping solutions APBNP of the implementation process in building construction work associated with APBNP. In addition this study wanted to find and establish the factors that affect product satisfaction in building construction. The method of sampling conducted in this research is to use purposive sampling and by using interviews and kuisener to see how the perception of stakeholders and the project owner. The analysis is carried out using quantitative and qualitative analysis as well as an association hypothesis by using the Pearson Product Moment (PPM). The hypothesis that there are 5 terms of the percentage difference between realization and an ideal time to satisfaction, the contract to the satisfaction of work per day and per day of work contract value per m 2 of product satisfaction, contract for alevel working day on satisfaction and contract work per m 2 per day pertingkat to the value of product satisfaction. The results obtained in this study is that the problems occur is the availability of materials, the number of volumes in a short time, labor and cooperation with other contractors in a building. The strategy used is more rapid dismantling of formwork, the addition of shift work and labor, the addition of equipment, production and coordination of self-help readymix intense. From the test results of PPM was also found that the factors that influence the construction of buildings is contract value per day of work and the contract value of work per day per a level. Based on study results found the ideal value of work per day contract for the building project is Rp.320.000.000, - and the ideal value of work per day for a level contract is Rp.55.000.000, -.
first_indexed 2024-03-13T22:34:13Z
format Thesis
id oai:generic.eprints.org:97888
institution Universiti Gadjah Mada
last_indexed 2024-03-13T22:34:13Z
publishDate 2012
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:978882016-03-04T08:46:16Z https://repository.ugm.ac.id/97888/ PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM) , Dimas Hastama Nugraha , Arief Setiawan Budi N, S.T,M.Eng, Ph.D ETD This study aims to map the problems associated with building projects and mapping solutions APBNP of the implementation process in building construction work associated with APBNP. In addition this study wanted to find and establish the factors that affect product satisfaction in building construction. The method of sampling conducted in this research is to use purposive sampling and by using interviews and kuisener to see how the perception of stakeholders and the project owner. The analysis is carried out using quantitative and qualitative analysis as well as an association hypothesis by using the Pearson Product Moment (PPM). The hypothesis that there are 5 terms of the percentage difference between realization and an ideal time to satisfaction, the contract to the satisfaction of work per day and per day of work contract value per m 2 of product satisfaction, contract for alevel working day on satisfaction and contract work per m 2 per day pertingkat to the value of product satisfaction. The results obtained in this study is that the problems occur is the availability of materials, the number of volumes in a short time, labor and cooperation with other contractors in a building. The strategy used is more rapid dismantling of formwork, the addition of shift work and labor, the addition of equipment, production and coordination of self-help readymix intense. From the test results of PPM was also found that the factors that influence the construction of buildings is contract value per day of work and the contract value of work per day per a level. Based on study results found the ideal value of work per day contract for the building project is Rp.320.000.000, - and the ideal value of work per day for a level contract is Rp.55.000.000, -. [Yogyakarta] : Universitas Gadjah Mada 2012 Thesis NonPeerReviewed , Dimas Hastama Nugraha and , Arief Setiawan Budi N, S.T,M.Eng, Ph.D (2012) PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=54555
spellingShingle ETD
, Dimas Hastama Nugraha
, Arief Setiawan Budi N, S.T,M.Eng, Ph.D
PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title_full PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title_fullStr PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title_full_unstemmed PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title_short PENGARUH PENDEKNYA KONTRAK KERJA TERHADAP PELAKSANAAN KONSTRUKSI BANGUNAN GEDUNG (Studi Kasus : Project Bangunan Gedung UGM)
title_sort pengaruh pendeknya kontrak kerja terhadap pelaksanaan konstruksi bangunan gedung studi kasus project bangunan gedung ugm
topic ETD
work_keys_str_mv AT dimashastamanugraha pengaruhpendeknyakontrakkerjaterhadappelaksanaankonstruksibangunangedungstudikasusprojectbangunangedungugm
AT ariefsetiawanbudinstmengphd pengaruhpendeknyakontrakkerjaterhadappelaksanaankonstruksibangunangedungstudikasusprojectbangunangedungugm