DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI

In Indonesia, there are many sources of alternative energy that can be converted into electrical energy, such as cow power. Generally, there are two commonly used profits from cow, it is the energy used to plow their fields, transporting goods and its waste can be make biogas, fertilizer and electri...

Full description

Bibliographic Details
Main Authors: , Muhammad Sholikhin, , Ir. Samsul Kamal, M.Sc., Ph.D
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2012
Subjects:
ETD
_version_ 1826045692993339392
author , Muhammad Sholikhin
, Ir. Samsul Kamal, M.Sc., Ph.D,
author_facet , Muhammad Sholikhin
, Ir. Samsul Kamal, M.Sc., Ph.D,
author_sort , Muhammad Sholikhin
collection UGM
description In Indonesia, there are many sources of alternative energy that can be converted into electrical energy, such as cow power. Generally, there are two commonly used profits from cow, it is the energy used to plow their fields, transporting goods and its waste can be make biogas, fertilizer and electricity. Use of cow dung was mostly done, while the new limited utilization of cattle to plow rice fields. In this research, cow power conversion into electricity is done by cow make a circular motion to rotate a generator through the transmission system. To get a high ratio from 3 rpm to 1500 rpm be able to change the electric motor becomes a generator. Besides on the transmission needed to reach four levels. Cow Power Plant system performance�s as a whole is done by connecting the mechanical system of cows with a generator through the transmission system. Generator is used in the form of an induction generator with a capacity of 1 / 4 Hp, Ns = 1500 rpm, 50 Hz, 3 Phase, 380/220 Volt. In the test, it is carried out with a cow and a load generator is load lamp which is expression of the real power with cos � = 1. The highest system efficiency is obtained at a load 45 watts with η = 27%. Utilization of the system at night is used for lighting the house during the 6-10 hours. With electricity previously stored in battery at the cow work during the day.
first_indexed 2024-03-13T22:41:18Z
format Thesis
id oai:generic.eprints.org:99978
institution Universiti Gadjah Mada
last_indexed 2024-03-13T22:41:18Z
publishDate 2012
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:999782016-03-04T08:47:53Z https://repository.ugm.ac.id/99978/ DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI , Muhammad Sholikhin , Ir. Samsul Kamal, M.Sc., Ph.D, ETD In Indonesia, there are many sources of alternative energy that can be converted into electrical energy, such as cow power. Generally, there are two commonly used profits from cow, it is the energy used to plow their fields, transporting goods and its waste can be make biogas, fertilizer and electricity. Use of cow dung was mostly done, while the new limited utilization of cattle to plow rice fields. In this research, cow power conversion into electricity is done by cow make a circular motion to rotate a generator through the transmission system. To get a high ratio from 3 rpm to 1500 rpm be able to change the electric motor becomes a generator. Besides on the transmission needed to reach four levels. Cow Power Plant system performance�s as a whole is done by connecting the mechanical system of cows with a generator through the transmission system. Generator is used in the form of an induction generator with a capacity of 1 / 4 Hp, Ns = 1500 rpm, 50 Hz, 3 Phase, 380/220 Volt. In the test, it is carried out with a cow and a load generator is load lamp which is expression of the real power with cos � = 1. The highest system efficiency is obtained at a load 45 watts with η = 27%. Utilization of the system at night is used for lighting the house during the 6-10 hours. With electricity previously stored in battery at the cow work during the day. [Yogyakarta] : Universitas Gadjah Mada 2012 Thesis NonPeerReviewed , Muhammad Sholikhin and , Ir. Samsul Kamal, M.Sc., Ph.D, (2012) DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=56319
spellingShingle ETD
, Muhammad Sholikhin
, Ir. Samsul Kamal, M.Sc., Ph.D,
DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title_full DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title_fullStr DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title_full_unstemmed DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title_short DESAIN DAN REALISASI MODEL PEMBANGKIT LISTRIK TENAGA SAPI
title_sort desain dan realisasi model pembangkit listrik tenaga sapi
topic ETD
work_keys_str_mv AT muhammadsholikhin desaindanrealisasimodelpembangkitlistriktenagasapi
AT irsamsulkamalmscphd desaindanrealisasimodelpembangkitlistriktenagasapi