Notification of completion rectification / Ahmad Hassanuddin Md Ishak

The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up o...

Full description

Bibliographic Details
Main Author: Ahmad Hassanuddin, Md Ishak
Format: Student Project
Language:English
Published: 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf
_version_ 1825737604084006912
author Ahmad Hassanuddin, Md Ishak
author_facet Ahmad Hassanuddin, Md Ishak
author_sort Ahmad Hassanuddin, Md Ishak
collection UITM
description The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up of 2,807 square feet and two-storey super link comes with 4 bedrooms and bathrooms each. This project was constructed in 2015 and completed in 2018. The project team involved are KW ASSOCIATE ARCHITECTS SDN BHD Architect, MEXCELCON is the main contractor for the project and also act as the engineering team. The sub-contractor for electrical is OTT Electrical. Mr. Desmond Siaw is the Project Unit Leader (PUL) the one who responsible to coordinate and lead the team on site.
first_indexed 2024-03-06T02:20:44Z
format Student Project
id oai:ir.uitm.edu.my:32619
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T02:20:44Z
publishDate 2019
record_format dspace
spelling oai:ir.uitm.edu.my:326192020-07-16T07:32:25Z https://ir.uitm.edu.my/id/eprint/32619/ Notification of completion rectification / Ahmad Hassanuddin Md Ishak Ahmad Hassanuddin, Md Ishak Management. Industrial Management Building inspection Architectural engineering. Structural engineering of buildings The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up of 2,807 square feet and two-storey super link comes with 4 bedrooms and bathrooms each. This project was constructed in 2015 and completed in 2018. The project team involved are KW ASSOCIATE ARCHITECTS SDN BHD Architect, MEXCELCON is the main contractor for the project and also act as the engineering team. The sub-contractor for electrical is OTT Electrical. Mr. Desmond Siaw is the Project Unit Leader (PUL) the one who responsible to coordinate and lead the team on site. 2019 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf Notification of completion rectification / Ahmad Hassanuddin Md Ishak. (2019) [Student Project]
spellingShingle Management. Industrial Management
Building inspection
Architectural engineering. Structural engineering of buildings
Ahmad Hassanuddin, Md Ishak
Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title_full Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title_fullStr Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title_full_unstemmed Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title_short Notification of completion rectification / Ahmad Hassanuddin Md Ishak
title_sort notification of completion rectification ahmad hassanuddin md ishak
topic Management. Industrial Management
Building inspection
Architectural engineering. Structural engineering of buildings
url https://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf
work_keys_str_mv AT ahmadhassanuddinmdishak notificationofcompletionrectificationahmadhassanuddinmdishak