A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]

From operation management view, the capacity of an operation is defined as the maximum level of value-added activity that the process can achieved under normal operating conditions. More often, especially in manufacturing sector, capacity is defined as the maximum production or output rate. Despite...

Full description

Bibliographic Details
Main Authors: Mohd Ghazalli, Abdul Rashid, Mohd Safie, Asrul Kamal, Zainol, Md Zahid
Format: Student Project
Language:English
Published: 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/34446/1/34446.pdf
_version_ 1796903827968884736
author Mohd Ghazalli, Abdul Rashid
Mohd Safie, Asrul Kamal
Zainol, Md Zahid
author_facet Mohd Ghazalli, Abdul Rashid
Mohd Safie, Asrul Kamal
Zainol, Md Zahid
author_sort Mohd Ghazalli, Abdul Rashid
collection UITM
description From operation management view, the capacity of an operation is defined as the maximum level of value-added activity that the process can achieved under normal operating conditions. More often, especially in manufacturing sector, capacity is defined as the maximum production or output rate. Despite having good capacity, the production rate / capacity are highly depending on the constraint available, which limited the company to achieve its current and future demand as well as opportunity available. In First Solar Kulim, the company is facing problem on it existing capacity. The existing production capacity is unable to manage and fulfil existing and additional demand on its solar panel. This is due to the First Solar German's factory and operation has been suspended, which had affected First Solar global production output. Increasing demand for solar panels products is another contributing factor. Without involving new investments, the problems of capacity constraints need to be addressed and resolved in order for First Solar to remain competitive in the market. In this study, the researchers have investigated on how to overcome the capacity constraints to enable First Solar Kulim to achieve its existing and future demand for its products. The researchers have focused on the process improvements at finishing area hich is the last process and become bottleneck in an existing First Solar throughput. There are four tests being conducted in order to find the best options for process improvement. All four tests have given significant results in terms of production output. However, the best option is selected based on the criteria of acceptable product quality such as panel dryness and visual specifications. This study could help to enable First Solar Kulim to manage its capacity constraints by doing a process improvement in order to achieve its maximum production output.
first_indexed 2024-03-06T02:26:02Z
format Student Project
id oai:ir.uitm.edu.my:34446
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T02:26:02Z
publishDate 2019
record_format dspace
spelling oai:ir.uitm.edu.my:344462020-11-17T04:44:44Z https://ir.uitm.edu.my/id/eprint/34446/ A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.] Mohd Ghazalli, Abdul Rashid Mohd Safie, Asrul Kamal Zainol, Md Zahid Management. Industrial Management Industrial productivity From operation management view, the capacity of an operation is defined as the maximum level of value-added activity that the process can achieved under normal operating conditions. More often, especially in manufacturing sector, capacity is defined as the maximum production or output rate. Despite having good capacity, the production rate / capacity are highly depending on the constraint available, which limited the company to achieve its current and future demand as well as opportunity available. In First Solar Kulim, the company is facing problem on it existing capacity. The existing production capacity is unable to manage and fulfil existing and additional demand on its solar panel. This is due to the First Solar German's factory and operation has been suspended, which had affected First Solar global production output. Increasing demand for solar panels products is another contributing factor. Without involving new investments, the problems of capacity constraints need to be addressed and resolved in order for First Solar to remain competitive in the market. In this study, the researchers have investigated on how to overcome the capacity constraints to enable First Solar Kulim to achieve its existing and future demand for its products. The researchers have focused on the process improvements at finishing area hich is the last process and become bottleneck in an existing First Solar throughput. There are four tests being conducted in order to find the best options for process improvement. All four tests have given significant results in terms of production output. However, the best option is selected based on the criteria of acceptable product quality such as panel dryness and visual specifications. This study could help to enable First Solar Kulim to manage its capacity constraints by doing a process improvement in order to achieve its maximum production output. 2019 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/34446/1/34446.pdf A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]. (2019) [Student Project] (Unpublished)
spellingShingle Management. Industrial Management
Industrial productivity
Mohd Ghazalli, Abdul Rashid
Mohd Safie, Asrul Kamal
Zainol, Md Zahid
A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title_full A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title_fullStr A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title_full_unstemmed A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title_short A study on the capacity constraint and production output at First Solar (M) Sdn Bhd / Abdul Rashid Mohd Ghazalli...[et al.]
title_sort study on the capacity constraint and production output at first solar m sdn bhd abdul rashid mohd ghazalli et al
topic Management. Industrial Management
Industrial productivity
url https://ir.uitm.edu.my/id/eprint/34446/1/34446.pdf
work_keys_str_mv AT mohdghazalliabdulrashid astudyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal
AT mohdsafieasrulkamal astudyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal
AT zainolmdzahid astudyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal
AT mohdghazalliabdulrashid studyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal
AT mohdsafieasrulkamal studyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal
AT zainolmdzahid studyonthecapacityconstraintandproductionoutputatfirstsolarmsdnbhdabdulrashidmohdghazallietal