Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman

The Industrialized Building Systems (IBS) concept was adopted and applied during early sixties in Malaysia. There are need to identify reason of the unresponsive and uninterested local contractor to the IBS. This study identifies knowledge of IBS components among respondents. The methodology adopted...

Full description

Bibliographic Details
Main Authors: Hassan, Siti Hafizan, Hashim, Mohamad Zain, Eman, Janidah
Format: Research Reports
Language:English
Published: 2011
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/36177/1/36177.PDF
_version_ 1825738253439860736
author Hassan, Siti Hafizan
Hashim, Mohamad Zain
Eman, Janidah
author_facet Hassan, Siti Hafizan
Hashim, Mohamad Zain
Eman, Janidah
author_sort Hassan, Siti Hafizan
collection UITM
description The Industrialized Building Systems (IBS) concept was adopted and applied during early sixties in Malaysia. There are need to identify reason of the unresponsive and uninterested local contractor to the IBS. This study identifies knowledge of IBS components among respondents. The methodology adopted for the study includes literature review, observation and questionnaire survey. These questionnaires were distributed to the respondents, which represent the construction industry players in Penang. This study identified the level of knowledge and understanding of IBS system among the construction player. The study had been concluded that the level of understanding and knowledge of respondents on industrial building systems are in medium level. The study also evaluated the opinion of respondents on advantages of IBS. There are five main advantages that most agreed by respondents. There are (l) Good Quality Control, (II) Faster Completion, (III) Easy Installation, (IV) Reduce Time and (V) Higher Quality. Those five advantages of IBS should be promoted by the authority in order to attract more IBS users.
first_indexed 2024-03-06T02:30:44Z
format Research Reports
id oai:ir.uitm.edu.my:36177
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T02:30:44Z
publishDate 2011
record_format dspace
spelling oai:ir.uitm.edu.my:361772020-11-10T05:37:45Z https://ir.uitm.edu.my/id/eprint/36177/ Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman Hassan, Siti Hafizan Hashim, Mohamad Zain Eman, Janidah TH Building construction Systems of building construction. Industrialized building Malaysia The Industrialized Building Systems (IBS) concept was adopted and applied during early sixties in Malaysia. There are need to identify reason of the unresponsive and uninterested local contractor to the IBS. This study identifies knowledge of IBS components among respondents. The methodology adopted for the study includes literature review, observation and questionnaire survey. These questionnaires were distributed to the respondents, which represent the construction industry players in Penang. This study identified the level of knowledge and understanding of IBS system among the construction player. The study had been concluded that the level of understanding and knowledge of respondents on industrial building systems are in medium level. The study also evaluated the opinion of respondents on advantages of IBS. There are five main advantages that most agreed by respondents. There are (l) Good Quality Control, (II) Faster Completion, (III) Easy Installation, (IV) Reduce Time and (V) Higher Quality. Those five advantages of IBS should be promoted by the authority in order to attract more IBS users. 2011-04 Research Reports NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/36177/1/36177.PDF Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman. (2011) [Research Reports] (Unpublished)
spellingShingle TH Building construction
Systems of building construction. Industrialized building
Malaysia
Hassan, Siti Hafizan
Hashim, Mohamad Zain
Eman, Janidah
Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title_full Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title_fullStr Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title_full_unstemmed Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title_short Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman
title_sort barrier and successful factor of ibs system case study in hostel construction uitm pulau pinang siti hafizan hassan mohamad zain hashim and janidah eman
topic TH Building construction
Systems of building construction. Industrialized building
Malaysia
url https://ir.uitm.edu.my/id/eprint/36177/1/36177.PDF
work_keys_str_mv AT hassansitihafizan barrierandsuccessfulfactorofibssystemcasestudyinhostelconstructionuitmpulaupinangsitihafizanhassanmohamadzainhashimandjanidaheman
AT hashimmohamadzain barrierandsuccessfulfactorofibssystemcasestudyinhostelconstructionuitmpulaupinangsitihafizanhassanmohamadzainhashimandjanidaheman
AT emanjanidah barrierandsuccessfulfactorofibssystemcasestudyinhostelconstructionuitmpulaupinangsitihafizanhassanmohamadzainhashimandjanidaheman