Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain
Manufacturing scheduling can be defined as a process of allocating and timing resources usage in a manufacturing system to complete jobs over time. According to (Pinedo, 2005), the purpose of scheduling in manufacturing is to minimise the production time and costs, by telling a production facility o...
Main Authors: | , , |
---|---|
Format: | Research Reports |
Language: | English |
Published: |
Research Management Institute (RMI)
2011
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/7891/1/LP_MUHAMMAD%20FIRDAUS%20MUSTAPHA%20RMI%2011_5%201.pdf |
_version_ | 1796899551068553216 |
---|---|
author | Mustapha, Muhammad Firdaus Che Hassan, Siti Hasrinafasya Wan Husain, Wan Salfarina |
author_facet | Mustapha, Muhammad Firdaus Che Hassan, Siti Hasrinafasya Wan Husain, Wan Salfarina |
author_sort | Mustapha, Muhammad Firdaus |
collection | UITM |
description | Manufacturing scheduling can be defined as a process of allocating and timing resources usage in a manufacturing system to complete jobs over time. According to (Pinedo, 2005), the purpose of scheduling in manufacturing is to minimise the production time and costs, by telling a production facility of what to make, when, with which staff,
and on which equipment in order to maximise the efficiency of operation and to reduce costs. In the mean time, rescheduling is performed in the manufacturing industry when
changes occur to update the current schedule in order to satisfy the changes. The new schedule is typically constructed using both jobs that are included in the previous schedule but have not started processing, followed by arrival of the new jobs. |
first_indexed | 2024-03-06T01:22:46Z |
format | Research Reports |
id | oai:ir.uitm.edu.my:7891 |
institution | Universiti Teknologi MARA |
language | English |
last_indexed | 2024-03-06T01:22:46Z |
publishDate | 2011 |
publisher | Research Management Institute (RMI) |
record_format | dspace |
spelling | oai:ir.uitm.edu.my:78912016-07-21T02:55:24Z https://ir.uitm.edu.my/id/eprint/7891/ Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain Mustapha, Muhammad Firdaus Che Hassan, Siti Hasrinafasya Wan Husain, Wan Salfarina Electronic Computers. Computer Science Computer software Manufacturing scheduling can be defined as a process of allocating and timing resources usage in a manufacturing system to complete jobs over time. According to (Pinedo, 2005), the purpose of scheduling in manufacturing is to minimise the production time and costs, by telling a production facility of what to make, when, with which staff, and on which equipment in order to maximise the efficiency of operation and to reduce costs. In the mean time, rescheduling is performed in the manufacturing industry when changes occur to update the current schedule in order to satisfy the changes. The new schedule is typically constructed using both jobs that are included in the previous schedule but have not started processing, followed by arrival of the new jobs. Research Management Institute (RMI) 2011 Research Reports NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/7891/1/LP_MUHAMMAD%20FIRDAUS%20MUSTAPHA%20RMI%2011_5%201.pdf Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain. (2011) [Research Reports] <http://terminalib.uitm.edu.my/7891.pdf> (Unpublished) |
spellingShingle | Electronic Computers. Computer Science Computer software Mustapha, Muhammad Firdaus Che Hassan, Siti Hasrinafasya Wan Husain, Wan Salfarina Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title | Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title_full | Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title_fullStr | Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title_full_unstemmed | Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title_short | Ontology-based problem solving method for dynamic scheduling in agile manufacturing / Muhammad Firdaus Mustapha, Siti Hasrinafasya Che Hassan and Wan Salfarina Wan Husain |
title_sort | ontology based problem solving method for dynamic scheduling in agile manufacturing muhammad firdaus mustapha siti hasrinafasya che hassan and wan salfarina wan husain |
topic | Electronic Computers. Computer Science Computer software |
url | https://ir.uitm.edu.my/id/eprint/7891/1/LP_MUHAMMAD%20FIRDAUS%20MUSTAPHA%20RMI%2011_5%201.pdf |
work_keys_str_mv | AT mustaphamuhammadfirdaus ontologybasedproblemsolvingmethodfordynamicschedulinginagilemanufacturingmuhammadfirdausmustaphasitihasrinafasyachehassanandwansalfarinawanhusain AT chehassansitihasrinafasya ontologybasedproblemsolvingmethodfordynamicschedulinginagilemanufacturingmuhammadfirdausmustaphasitihasrinafasyachehassanandwansalfarinawanhusain AT wanhusainwansalfarina ontologybasedproblemsolvingmethodfordynamicschedulinginagilemanufacturingmuhammadfirdausmustaphasitihasrinafasyachehassanandwansalfarinawanhusain |