Developing a generic safety performance evaluation prototype for construction projects in Malaysia

Thesis (PhD. (Civil Engineering))

Bibliographic Details
Main Author: Bavafa, Ali Asghar
Format: Thesis
Language:English
Published: Universiti Teknologi Malaysia 2024
Subjects:
Online Access:http://openscience.utm.my/handle/123456789/1271
_version_ 1811131829258813440
author Bavafa, Ali Asghar
author_facet Bavafa, Ali Asghar
author_sort Bavafa, Ali Asghar
collection OpenScience
description Thesis (PhD. (Civil Engineering))
first_indexed 2024-09-23T23:50:18Z
format Thesis
id oai:openscience.utm.my:123456789/1271
institution Universiti Teknologi Malaysia - OpenScience
language English
last_indexed 2024-09-23T23:50:18Z
publishDate 2024
publisher Universiti Teknologi Malaysia
record_format dspace
spelling oai:openscience.utm.my:123456789/12712024-07-23T10:00:55Z Developing a generic safety performance evaluation prototype for construction projects in Malaysia Bavafa, Ali Asghar Construction projects—Management Construction industry—Safety measures Industrial safety—Evaluation Thesis (PhD. (Civil Engineering)) Despite recent efforts that have been made to improve construction safety, this industry yet considered unsafe (hazardous) due to high number of recorded accident. Based on the statistics released by Department of Occupational Safety and Health (DOSH) in Malaysia, between 2009 to 2015 the highest rate of fatality is for construction sector. To avoid accidents in construction projects there is a need to implement proper safety and health program and ensure that safe working practice is in place. Moreover, safety performance must be monitored and evaluated. This research addresses the interactions among safety factors during evaluation process which have not been considered before. Moreover, majority of the measurement techniques disregards the (pivotal) role of parties such as owner, designer and subcontractors who have consequential affecting the construction safety and health. This research aims to develops a Generic Safety Performance Evaluation Prototype (GSPEP) for construction projects in Malaysia. The first objective is to identify and verify, the significant safety performance factors and sub-factors that affect the construction projects in Malaysia. The second objective is to obtain the interactions between safety performance factors through Decision Making Trial and Evaluation Laboratory (DEMATEL) method while the decision model is developed. The results indicate that “Safety Commitment” is the most influential safety factor while, “Management Implementations” has the highest total effect rate. In the third objective, the Analytic Network Process (ANP) is employed to derive weightage of factors and sub factors of new safety framework. The GSPEP is developed in objective 4, which comprises 11 factors, 53 sub factors and 125 indicators that carry weightage according to their effectiveness in preventing of the occurring of construction accidents. The score of a project safety would be calculated according to evaluation of indicators in complying to safety standards. As the last objective, the GSPEP is then implemented in real case studies and evaluated through the judgments of two groups of construction safety experts and academic researchers to determine its applicability and validity level in evaluating safety and health performance of construction projects in Malaysia. The experts in both groups recognized the performance and effectiveness of the GSPEP as a new method for safety evaluation. The GSPEP evaluate the safety level of a construction project and its weaknesses within the construction organization. The GSPEP also be able to facilitate the awareness in improving safety culture on construction projects, since it involves the cooperation of all personnel from top management to ordinary workers. This research on GSPEP is a comprehensive decision maker that can be employed as a new system to benchmark the safety and health performance level of construction companies in Malaysia. Faculty of Civil Engineering 2024-07-23T01:35:11Z 2024-07-23T01:35:11Z 2017 Thesis Dataset http://openscience.utm.my/handle/123456789/1271 en application/pdf Universiti Teknologi Malaysia
spellingShingle Construction projects—Management
Construction industry—Safety measures
Industrial safety—Evaluation
Bavafa, Ali Asghar
Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title_full Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title_fullStr Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title_full_unstemmed Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title_short Developing a generic safety performance evaluation prototype for construction projects in Malaysia
title_sort developing a generic safety performance evaluation prototype for construction projects in malaysia
topic Construction projects—Management
Construction industry—Safety measures
Industrial safety—Evaluation
url http://openscience.utm.my/handle/123456789/1271
work_keys_str_mv AT bavafaaliasghar developingagenericsafetyperformanceevaluationprototypeforconstructionprojectsinmalaysia