Automation of integrated system on MyCREST and life cycle costing

Thesis (PhD. (Civil Engineering))

Bibliographic Details
Main Author: Khan, Jam Shahzaib
Format: Thesis
Language:English
Published: Universiti Teknologi Malaysia 2023
Subjects:
Online Access:http://openscience.utm.my/handle/123456789/647
_version_ 1796848892999892992
author Khan, Jam Shahzaib
author_facet Khan, Jam Shahzaib
author_sort Khan, Jam Shahzaib
collection OpenScience
description Thesis (PhD. (Civil Engineering))
first_indexed 2024-03-05T17:34:27Z
format Thesis
id oai:openscience.utm.my:123456789/647
institution Universiti Teknologi Malaysia - OpenScience
language English
last_indexed 2024-03-05T17:34:27Z
publishDate 2023
publisher Universiti Teknologi Malaysia
record_format dspace
spelling oai:openscience.utm.my:123456789/6472023-08-27T14:00:21Z Automation of integrated system on MyCREST and life cycle costing Khan, Jam Shahzaib Life cycle costing Electronic data processing Sustainable buildings—Design and construction—Costs Information storage and retrieval systems—Decision making Thesis (PhD. (Civil Engineering)) The global building construction activities is responsible for 30-40% of global energy consumption thus with this contributes around 30% of greenhouse gas emissions. The holistic approach by green buildings recon can reduce 30-50% of energy usage, 35% of CO2 emissions, 70% of waste generation and 40% of water usage. However, the decline in financial markets and economic turmoil has meltdown interest of investors towards green-certified buildings due to higher cost implications and needed bigger capital. Additionally, Green Building Rating Tools (GBRT) do not provide Life Cycle Cost (LCC) analysis, where at the same time is a lack of available decision making support tool for GBRT integrated with LCC. This research developed an integrated web-based system which has applied GBRT, computer programming, and LCC analysis. This study has used Malaysia Carbon Reduction and Environment Sustainability Tool (MyCREST) for the integration with LCC. The study identified criteria, sub-criteria and super sub-criteria of MyCREST and with elements of LCC that combine to develop an integrated framework, thus later was transformed into an automated analogue computerised programming system using architectural programming flow system. Twenty-five sets of matrix form of MyCREST and LLC have been developed for the confirmation of professional in the field of GBRT and LCC. Two levels of Focus Group Discussions (FGD) were conducted amongst Qualified Professionals QP?s of GBRT. The quantitative data were analysed using (SPSS V.17) software that achieved frequency analysis, factor score analysis, weightage factor analysis and developed the cost control weightage distribution. The results output led to the development of cumulative control weightage of LCC. The cumulative cost control weightage indicates management cost 35%; development cost 20%; operation cost 14%; construction & installation cost 11%; maintenance cost 10%; replacement cost 6%; and contingencies cost 4%. The achieved cumulative control weightage is later were formulated into automated analogue computerised programming whereby this web-based innovation is named MyCREST-LCC. This MyCREST-LCC tool provides easy, efficient and effectively integrated programming that also offers to forecast of lifetime cost occurrence in green buildings. In conclusion, this innovative new approach of integrated automated web-based MyCREST-LCC assists construction stakeholders in the construction industry for providing a better, easy and quick way of decision making. The outcome adds value to green building project development, thus mapping the future cost that incurs in any proposal of green building development either locally or international wide. Faculty of Engineering - School of Civil Engineering 2023-08-27T05:38:14Z 2023-08-27T05:38:14Z 2019 Thesis Dataset NA NA http://openscience.utm.my/handle/123456789/647 en NA; NA application/pdf Universiti Teknologi Malaysia
spellingShingle Life cycle costing
Electronic data processing
Sustainable buildings—Design and construction—Costs
Information storage and retrieval systems—Decision making
Khan, Jam Shahzaib
Automation of integrated system on MyCREST and life cycle costing
title Automation of integrated system on MyCREST and life cycle costing
title_full Automation of integrated system on MyCREST and life cycle costing
title_fullStr Automation of integrated system on MyCREST and life cycle costing
title_full_unstemmed Automation of integrated system on MyCREST and life cycle costing
title_short Automation of integrated system on MyCREST and life cycle costing
title_sort automation of integrated system on mycrest and life cycle costing
topic Life cycle costing
Electronic data processing
Sustainable buildings—Design and construction—Costs
Information storage and retrieval systems—Decision making
url http://openscience.utm.my/handle/123456789/647
work_keys_str_mv AT khanjamshahzaib automationofintegratedsystemonmycrestandlifecyclecosting