The development of intra-train beam stabilisation system prototypes for a future linear collider
<p>Any future linear collider requires a beam stabilisation system at the interaction point to the to maintain luminosities. This thesis details the development of prototypes of three such systems based at the Accelerator Test Facility 2 (ATF2) at KEK, Japan.</p> <p>The upstream fe...
Huvudupphovsman: | Davis, MR |
---|---|
Övriga upphovsmän: | Burrows, P |
Materialtyp: | Lärdomsprov |
Språk: | English |
Publicerad: |
2014
|
Ämnen: |
Liknande verk
-
The development of a fast intra-train beam-based feedback system capable of operating on the bunch trains of the International Linear Collider
av: Bett, D
Publicerad: (2013) -
An intra-pulse fast feedback system for a future linear collider
av: Jolly, S
Publicerad: (2003) -
CLIC drive beam phase stabilisation
av: Gerbershagen, A
Publicerad: (2013) -
Instrumentation for colliding beam physics /
av: International Conference on Instumentation for Colliding Beam Physics n(5th : 1990 : Novosibirsk, USSR), et al.
Publicerad: (1990) -
A study of interferometric distance measurement systems on a prototype rapid tunnel reference surveyor and the effects of reference network errors at the International Linear Collider
av: Dale, J, et al.
Publicerad: (2009)