Integrated Asset Maintenance: A lab-based demonstrator

The effectiveness of the maintenance scheduling decision depends on the availability of information regarding the remaining useful life of the asset in addition to the asset operating schedule and spares and resources required to carry out the maintenance action. In this paper, we illustrate an inte...

Cijeli opis

Bibliografski detalji
Glavni autori: Brintrup, A, Ouertani, M, Srinivasan, R, Parlikad, A, McFarlane, D, Ranasinghe, D, Kelepouris, T, Lopez, T, Thorne, A, Harrison, M, Cuthbert, R
Format: Conference item
Izdano: 2009
_version_ 1826271618246115328
author Brintrup, A
Ouertani, M
Srinivasan, R
Parlikad, A
McFarlane, D
Ranasinghe, D
Kelepouris, T
Lopez, T
Thorne, A
Harrison, M
Cuthbert, R
author_facet Brintrup, A
Ouertani, M
Srinivasan, R
Parlikad, A
McFarlane, D
Ranasinghe, D
Kelepouris, T
Lopez, T
Thorne, A
Harrison, M
Cuthbert, R
author_sort Brintrup, A
collection OXFORD
description The effectiveness of the maintenance scheduling decision depends on the availability of information regarding the remaining useful life of the asset in addition to the asset operating schedule and spares and resources required to carry out the maintenance action. In this paper, we illustrate an integrated asset maintenance approach using a lab-based demonstrator where a washing machine unit is deployed as the “asset”. The condition of the washing machine is assessed using data from a number of embedded wireless sensors to monitor critical parameters. The configuration of the washing machine is monitored using Radio Frequency Identification (RFID) tags. In addition to the condition monitoring platform, the demonstrator includes a supply chain platform with RFID infrastructure to provide real-time tracking information to predict the availability of spare parts within a given time horizon. Information from the condition monitoring platform and the supply chain tracking platform is then fed to a decision support system (DSS) which uses the available information to optimise the total cost of maintenance and decide the following parameters: (a) timing of maintenance, (b) choice of the appropriate spare part, (c) choice of the repair personnel.
first_indexed 2024-03-06T21:59:29Z
format Conference item
id oxford-uuid:4e17fe52-8c2b-4626-9a2a-e91461daf6d4
institution University of Oxford
last_indexed 2024-03-06T21:59:29Z
publishDate 2009
record_format dspace
spelling oxford-uuid:4e17fe52-8c2b-4626-9a2a-e91461daf6d42022-03-26T15:59:12ZIntegrated Asset Maintenance: A lab-based demonstratorConference itemhttp://purl.org/coar/resource_type/c_5794uuid:4e17fe52-8c2b-4626-9a2a-e91461daf6d4Saïd Business School - Eureka2009Brintrup, AOuertani, MSrinivasan, RParlikad, AMcFarlane, DRanasinghe, DKelepouris, TLopez, TThorne, AHarrison, MCuthbert, RThe effectiveness of the maintenance scheduling decision depends on the availability of information regarding the remaining useful life of the asset in addition to the asset operating schedule and spares and resources required to carry out the maintenance action. In this paper, we illustrate an integrated asset maintenance approach using a lab-based demonstrator where a washing machine unit is deployed as the “asset”. The condition of the washing machine is assessed using data from a number of embedded wireless sensors to monitor critical parameters. The configuration of the washing machine is monitored using Radio Frequency Identification (RFID) tags. In addition to the condition monitoring platform, the demonstrator includes a supply chain platform with RFID infrastructure to provide real-time tracking information to predict the availability of spare parts within a given time horizon. Information from the condition monitoring platform and the supply chain tracking platform is then fed to a decision support system (DSS) which uses the available information to optimise the total cost of maintenance and decide the following parameters: (a) timing of maintenance, (b) choice of the appropriate spare part, (c) choice of the repair personnel.
spellingShingle Brintrup, A
Ouertani, M
Srinivasan, R
Parlikad, A
McFarlane, D
Ranasinghe, D
Kelepouris, T
Lopez, T
Thorne, A
Harrison, M
Cuthbert, R
Integrated Asset Maintenance: A lab-based demonstrator
title Integrated Asset Maintenance: A lab-based demonstrator
title_full Integrated Asset Maintenance: A lab-based demonstrator
title_fullStr Integrated Asset Maintenance: A lab-based demonstrator
title_full_unstemmed Integrated Asset Maintenance: A lab-based demonstrator
title_short Integrated Asset Maintenance: A lab-based demonstrator
title_sort integrated asset maintenance a lab based demonstrator
work_keys_str_mv AT brintrupa integratedassetmaintenancealabbaseddemonstrator
AT ouertanim integratedassetmaintenancealabbaseddemonstrator
AT srinivasanr integratedassetmaintenancealabbaseddemonstrator
AT parlikada integratedassetmaintenancealabbaseddemonstrator
AT mcfarlaned integratedassetmaintenancealabbaseddemonstrator
AT ranasinghed integratedassetmaintenancealabbaseddemonstrator
AT kelepourist integratedassetmaintenancealabbaseddemonstrator
AT lopezt integratedassetmaintenancealabbaseddemonstrator
AT thornea integratedassetmaintenancealabbaseddemonstrator
AT harrisonm integratedassetmaintenancealabbaseddemonstrator
AT cuthbertr integratedassetmaintenancealabbaseddemonstrator