Forecasting for battery storage: choosing the error metric

We describe our approach to the Western Power Distribution (WPD) Presumed Open Data (POD) 6 MWh battery storage capacity forecasting competition, in which we finished second. The competition entails two distinct forecasting aims to maximise the daily evening peak reduction and using as much solar ph...

Disgrifiad llawn

Manylion Llyfryddiaeth
Prif Awduron: Singleton, C, Grindrod, P
Fformat: Journal article
Iaith:English
Cyhoeddwyd: MDPI 2021
Disgrifiad
Crynodeb:We describe our approach to the Western Power Distribution (WPD) Presumed Open Data (POD) 6 MWh battery storage capacity forecasting competition, in which we finished second. The competition entails two distinct forecasting aims to maximise the daily evening peak reduction and using as much solar photovoltaic energy as possible. For the latter, we combine a Bayesian (MCMC) linear regression model with an average generation distribution. For the former, we introduce a new error metric that allows even a simple weighted average combined with a simple linear regression model to score very well using the competition performance metric.