Performance simulations of a phase stabilization system prototype for CTF3

The CLIC drive beam provides RF power for acceleration of the main beam, and hence thedrive beam's longitudinal phase tolerances are very tight. A feedforward chicane consistingof four electromagnetic kickers is proposed as a correction system for the phase errors,which should allow loosening o...

Full description

Bibliographic Details
Main Authors: Gerbershagen, A, Schulte, D, Skowronski, P, Persson, T, Ikarios, E, Burrows, P, Christian, G, Perry, C
Format: Journal article
Language:English
Published: 2012