Performance simulations of a phase stabilization system prototype for CTF3
The CLIC drive beam provides RF power for acceleration of the main beam, and hence thedrive beam's longitudinal phase tolerances are very tight. A feedforward chicane consistingof four electromagnetic kickers is proposed as a correction system for the phase errors,which should allow loosening o...
Main Authors: | , , , , , , , |
---|---|
Format: | Journal article |
Language: | English |
Published: |
2012
|