The empirical reality of IT project cost overruns: discovering a power-law distribution
If managers assume a normal or near-normal distribution of Information Technology (IT) project cost overruns, as is common, and cost overruns can be shown to follow a power-law distribution, managers may be unwittingly exposing their organizations to extreme risk by severely underestimating the prob...
Príomhchruthaitheoirí: | Flyvbjerg, B, Budzier, A, Lee, JS, Keil, M, Lunn, D, Bester, DW |
---|---|
Formáid: | Journal article |
Teanga: | English |
Foilsithe / Cruthaithe: |
Taylor and Francis
2022
|
Míreanna comhchosúla
Míreanna comhchosúla
-
What causes cost overrun in transport infrastructure projects
de réir: Flyvbjerg, B, et al.
Foilsithe / Cruthaithe: (2004) -
Five things you should know about cost overrun
de réir: Flyvbjerg, B, et al.
Foilsithe / Cruthaithe: (2018) -
How Common and How Large are Cost Overruns in Transport Infrastructure Projects?
de réir: Flyvbjerg, B, et al.
Foilsithe / Cruthaithe: (2003) -
Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure
de réir: Flyvbjerg, B
Foilsithe / Cruthaithe: (2007) -
Cost Overruns in Large-scale Tranportation Infrastructure Projects: Explanations and their Theoretical Embeddedness
de réir: Flyvbjerg, B, et al.
Foilsithe / Cruthaithe: (2010)