The Compact Linear Collider (CLIC) – Project Implementation Plan

The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+e- collider under development by international collaborations hosted by CERN. This document provides an overview of the design, technology, and implementation aspects of the CLIC accelerator. For an optimal exploitation of it...

Ful tanımlama

Detaylı Bibliyografya
Asıl Yazarlar: Aicheler, M, Burrows, P, Lasheras, N, Draper, M, Osborne, J, Schulte, D, Stapnes, S, Stuart, M
Materyal Türü: Kitap
Baskı/Yayın Bilgisi: CERN Publishing 2019
_version_ 1826299211264557056
author Aicheler, M
Burrows, P
Lasheras, N
Draper, M
Osborne, J
Schulte, D
Stapnes, S
Stuart, M
author_facet Aicheler, M
Burrows, P
Lasheras, N
Draper, M
Osborne, J
Schulte, D
Stapnes, S
Stuart, M
author_sort Aicheler, M
collection OXFORD
description The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+e- collider under development by international collaborations hosted by CERN. This document provides an overview of the design, technology, and implementation aspects of the CLIC accelerator. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, for a site length ranging between 11 km and 50 km. CLIC uses a Two-Beam acceleration scheme, in which normal-conducting high- gradient 12 GHz accelerating structures are powered via a high-current Drive Beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments, and system tests have resulted in significant progress in recent years. Moreover, this has led to an increased energy efficiency and reduced power consumption of around 170 MW for the 380 GeV stage, together with a reduced cost estimate of approximately 6 billion CHF. The construction of the first CLIC energy stage could start as early as 2026 and first beams would be available by 2035, marking the beginning of a physics programme spanning 25–30 years and providing excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.
first_indexed 2024-03-07T04:58:27Z
format Book
id oxford-uuid:d76e68cc-ac4d-4af6-a07a-6f510728b9e4
institution University of Oxford
last_indexed 2024-03-07T04:58:27Z
publishDate 2019
publisher CERN Publishing
record_format dspace
spelling oxford-uuid:d76e68cc-ac4d-4af6-a07a-6f510728b9e42022-03-27T08:41:01ZThe Compact Linear Collider (CLIC) – Project Implementation PlanBookhttp://purl.org/coar/resource_type/c_2f33uuid:d76e68cc-ac4d-4af6-a07a-6f510728b9e4Symplectic Elements at OxfordCERN Publishing2019Aicheler, MBurrows, PLasheras, NDraper, MOsborne, JSchulte, DStapnes, SStuart, MThe Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+e- collider under development by international collaborations hosted by CERN. This document provides an overview of the design, technology, and implementation aspects of the CLIC accelerator. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, for a site length ranging between 11 km and 50 km. CLIC uses a Two-Beam acceleration scheme, in which normal-conducting high- gradient 12 GHz accelerating structures are powered via a high-current Drive Beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments, and system tests have resulted in significant progress in recent years. Moreover, this has led to an increased energy efficiency and reduced power consumption of around 170 MW for the 380 GeV stage, together with a reduced cost estimate of approximately 6 billion CHF. The construction of the first CLIC energy stage could start as early as 2026 and first beams would be available by 2035, marking the beginning of a physics programme spanning 25–30 years and providing excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.
spellingShingle Aicheler, M
Burrows, P
Lasheras, N
Draper, M
Osborne, J
Schulte, D
Stapnes, S
Stuart, M
The Compact Linear Collider (CLIC) – Project Implementation Plan
title The Compact Linear Collider (CLIC) – Project Implementation Plan
title_full The Compact Linear Collider (CLIC) – Project Implementation Plan
title_fullStr The Compact Linear Collider (CLIC) – Project Implementation Plan
title_full_unstemmed The Compact Linear Collider (CLIC) – Project Implementation Plan
title_short The Compact Linear Collider (CLIC) – Project Implementation Plan
title_sort compact linear collider clic project implementation plan
work_keys_str_mv AT aichelerm thecompactlinearcolliderclicprojectimplementationplan
AT burrowsp thecompactlinearcolliderclicprojectimplementationplan
AT lasherasn thecompactlinearcolliderclicprojectimplementationplan
AT draperm thecompactlinearcolliderclicprojectimplementationplan
AT osbornej thecompactlinearcolliderclicprojectimplementationplan
AT schulted thecompactlinearcolliderclicprojectimplementationplan
AT stapness thecompactlinearcolliderclicprojectimplementationplan
AT stuartm thecompactlinearcolliderclicprojectimplementationplan
AT aichelerm compactlinearcolliderclicprojectimplementationplan
AT burrowsp compactlinearcolliderclicprojectimplementationplan
AT lasherasn compactlinearcolliderclicprojectimplementationplan
AT draperm compactlinearcolliderclicprojectimplementationplan
AT osbornej compactlinearcolliderclicprojectimplementationplan
AT schulted compactlinearcolliderclicprojectimplementationplan
AT stapness compactlinearcolliderclicprojectimplementationplan
AT stuartm compactlinearcolliderclicprojectimplementationplan