Stabilization of the arrival time of a relativistic electron beam to the 50 fs level

We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The...

সম্পূর্ণ বিবরণ

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Roberts, J, Skowronski, P, Burrows, PN, Christian, GB, Corsini, R, Ghigo, A, Marcellini, F, Perry, C
বিন্যাস: Journal article
প্রকাশিত: American Physical Society 2018

অনুরূপ উপাদানগুলি