How (in)accurate are demand forecasts in public works projects? The case of transportation.
his article presents results from the first statistically significant study of traffic forecasts in transportation infrastructure projects. The sample used is the largest of its kind, covering 210 projects in 14 nations worth U.S.$59 billion. The study shows with very high statistical significance t...
المؤلفون الرئيسيون: | Flyvbjerg, B, Holm, M, Buhl, S |
---|---|
التنسيق: | Journal article |
منشور في: |
2005
|
مواد مشابهة
-
How Common and How Large are Cost Overruns in Transport Infrastructure Projects?
حسب: Flyvbjerg, B, وآخرون
منشور في: (2003) -
Underestimating Costs in Public Works Projects: Error or Lie?
حسب: Flyvbjerg, B, وآخرون
منشور في: (2002) -
What causes cost overrun in transport infrastructure projects
حسب: Flyvbjerg, B, وآخرون
منشور في: (2004) -
Inaccuracy in traffic forecasts
حسب: Flyvbjerg, B, وآخرون
منشور في: (2006) -
Public Planning of Mega-Projects: Overestimation of Demand and Underestimation of Costs
حسب: Flyvbjerg, B
منشور في: (2008)