A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin
Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost, time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expected...
Main Author: | Kamaruddin, Siti Syariazulfa |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Institute of Graduate Studies, UiTM
2018
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/22016/1/ABS_SITI%20SYARIAZULFA%20KAMARUDDIN%20TDRA%20VOL%2014%20IGS%2018.pdf |
Similar Items
-
The mechanisation and automation of the ibs construction approach in Malaysia / Siti Syariazulfa Kamaruddi ... [et al.]
by: Kamaruddi, Siti Syariazulfa, et al.
Published: (2018) -
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail
by: Ismail, Muhammad Aizat
Published: (2012) -
Payment issues in Malaysia Industrialised Building System (IBS): A research framework
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015) -
Mechanisation in building /
by: 243804 Vallings, H. G.
Published: (1975) -
Flexibility supply chain in Industrialised Building System (IBS)
by: Kassim, Umar, et al.
Published: (2013)