Flood estimation analysis on Sg Ara catchment / Judy Primus

Flood becomes one of the major critical problems in Malaysia especially in the floodplain area like Pulau Pinang and Kuala Lumpur. If flood can be predicted, controlled and managed systematically, the lost due to flood such as life, properties and resources can always be prevented or at least minimi...

Full description

Bibliographic Details
Main Author: Primus, Judy
Format: Student Project
Language:English
Published: Faculty Of Civil Engineering 2005
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/22993/2/22993.pdf
_version_ 1796901656347017216
author Primus, Judy
author_facet Primus, Judy
author_sort Primus, Judy
collection UITM
description Flood becomes one of the major critical problems in Malaysia especially in the floodplain area like Pulau Pinang and Kuala Lumpur. If flood can be predicted, controlled and managed systematically, the lost due to flood such as life, properties and resources can always be prevented or at least minimized. Thus, flood estimation is needed. In this study, the method to do flood estimation is using Time-Area Method. This study depicts flood estimation analysis that was conducted for the design flood events for the design flood events for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. The result of this study indicates that the study area, Sg Ara is estimated to be flood for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. With this flood estimation analysis, the immediate action can be taken to overcome the upcoming problems.
first_indexed 2024-03-06T01:53:21Z
format Student Project
id uitm.eprints-2993
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T01:53:21Z
publishDate 2005
publisher Faculty Of Civil Engineering
record_format dspace
spelling uitm.eprints-29932023-01-18T08:14:20Z https://ir.uitm.edu.my/id/eprint/22993/ Flood estimation analysis on Sg Ara catchment / Judy Primus Primus, Judy Hydrology. Water Flood becomes one of the major critical problems in Malaysia especially in the floodplain area like Pulau Pinang and Kuala Lumpur. If flood can be predicted, controlled and managed systematically, the lost due to flood such as life, properties and resources can always be prevented or at least minimized. Thus, flood estimation is needed. In this study, the method to do flood estimation is using Time-Area Method. This study depicts flood estimation analysis that was conducted for the design flood events for the design flood events for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. The result of this study indicates that the study area, Sg Ara is estimated to be flood for 5, 10, 20, 50 and 100 year Average recurrence Interval (ARI) with 120 minutes design rainfall duration. With this flood estimation analysis, the immediate action can be taken to overcome the upcoming problems. Faculty Of Civil Engineering 2005 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/22993/2/22993.pdf Flood estimation analysis on Sg Ara catchment / Judy Primus. (2005) [Student Project] (Submitted)
spellingShingle Hydrology. Water
Primus, Judy
Flood estimation analysis on Sg Ara catchment / Judy Primus
title Flood estimation analysis on Sg Ara catchment / Judy Primus
title_full Flood estimation analysis on Sg Ara catchment / Judy Primus
title_fullStr Flood estimation analysis on Sg Ara catchment / Judy Primus
title_full_unstemmed Flood estimation analysis on Sg Ara catchment / Judy Primus
title_short Flood estimation analysis on Sg Ara catchment / Judy Primus
title_sort flood estimation analysis on sg ara catchment judy primus
topic Hydrology. Water
url https://ir.uitm.edu.my/id/eprint/22993/2/22993.pdf
work_keys_str_mv AT primusjudy floodestimationanalysisonsgaracatchmentjudyprimus