A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab

This research was conducted to study on the issues of the maintenance work during defect liability period (DLP) for projects under Majlis Perbandaran Taiping, Perak. The research was commenced by introduction to all theory which are related to maintenance scope and furthered with the maintenance wor...

Full description

Bibliographic Details
Main Author: Abdul Wahab, Marlia
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2009
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/25352/2/25352.pdf
_version_ 1796902096843309056
author Abdul Wahab, Marlia
author_facet Abdul Wahab, Marlia
author_sort Abdul Wahab, Marlia
collection UITM
description This research was conducted to study on the issues of the maintenance work during defect liability period (DLP) for projects under Majlis Perbandaran Taiping, Perak. The research was commenced by introduction to all theory which are related to maintenance scope and furthered with the maintenance work in construction period. To more understanding the introduction regarding the DLP in each types of condition contract which is PWD 203 (2007), PAM 2006 and also CIDB 2000 based on the Standard of Form Contract which used in Malaysia has been discussed to know its meaning, who is person in charge during that period and all the responsible parties that involve during this stage. For the data analysis, it was collected via the interview with person who involved in maintenance works during DLP in each of case studies and also through the questionnaire distributed. The distributed questionnaires has been answered by various position of the construction industry people and also public people. All the data collected from the survey has been analysed and the finding was showed that there have a different view where was from questionnaire it shows that most of respondents choose the poor workmanship as a highest factor which may cause the defects during DLP while from the case studies it shows that the defect cause during that period more to third party liability’s fault. After the finding have recognized, some recommendations and approaches has been given in order to overcome the problem in each issues.
first_indexed 2024-03-06T01:59:49Z
format Student Project
id uitm.eprints-5352
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T01:59:49Z
publishDate 2009
publisher Faculty of Architecture, Planning and Surveying
record_format dspace
spelling uitm.eprints-53522022-12-29T09:01:49Z https://ir.uitm.edu.my/id/eprint/25352/ A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab Abdul Wahab, Marlia Maintenance and repair Building inspection Building fittings and their installation This research was conducted to study on the issues of the maintenance work during defect liability period (DLP) for projects under Majlis Perbandaran Taiping, Perak. The research was commenced by introduction to all theory which are related to maintenance scope and furthered with the maintenance work in construction period. To more understanding the introduction regarding the DLP in each types of condition contract which is PWD 203 (2007), PAM 2006 and also CIDB 2000 based on the Standard of Form Contract which used in Malaysia has been discussed to know its meaning, who is person in charge during that period and all the responsible parties that involve during this stage. For the data analysis, it was collected via the interview with person who involved in maintenance works during DLP in each of case studies and also through the questionnaire distributed. The distributed questionnaires has been answered by various position of the construction industry people and also public people. All the data collected from the survey has been analysed and the finding was showed that there have a different view where was from questionnaire it shows that most of respondents choose the poor workmanship as a highest factor which may cause the defects during DLP while from the case studies it shows that the defect cause during that period more to third party liability’s fault. After the finding have recognized, some recommendations and approaches has been given in order to overcome the problem in each issues. Faculty of Architecture, Planning and Surveying 2009 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/25352/2/25352.pdf A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab. (2009) [Student Project] <http://terminalib.uitm.edu.my/25352.pdf> (Unpublished)
spellingShingle Maintenance and repair
Building inspection
Building fittings and their installation
Abdul Wahab, Marlia
A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title_full A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title_fullStr A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title_full_unstemmed A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title_short A study on the issues of the maintenance works during defect liability period for projects under Majlis Perbandaran Taiping / Marlia Abdul Wahab
title_sort study on the issues of the maintenance works during defect liability period for projects under majlis perbandaran taiping marlia abdul wahab
topic Maintenance and repair
Building inspection
Building fittings and their installation
url https://ir.uitm.edu.my/id/eprint/25352/2/25352.pdf
work_keys_str_mv AT abdulwahabmarlia astudyontheissuesofthemaintenanceworksduringdefectliabilityperiodforprojectsundermajlisperbandarantaipingmarliaabdulwahab
AT abdulwahabmarlia studyontheissuesofthemaintenanceworksduringdefectliabilityperiodforprojectsundermajlisperbandarantaipingmarliaabdulwahab