Factors that contributes to the on-time delivery performance of Hicom Diecasting Sdn Bhd, Shah Alam / Nursyahida Rosli
According to the topic chosen, on time delivery (OTD) is one of the key performance indicators (KPI) of the Hicom Diecasting, Shah Alam. Research objectives for this study undertaken are to identify the most frequent evaluations of dependent variables, to identify the ranking evaluation on the indep...
Main Author: | Rosli, Nursyahida |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Business and Management
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/26352/1/PPb_NURSYAHIDA%20ROSLI%20BM%20M%2010_5.pdf |
Similar Items
-
Workplace motivation among the technicians of Raisevest Sdn Bhd / Noor Asikin Ab Rahman
by: Ab Rahman, Noor Asikin
Published: (2009) -
The case of Proton Tanjung Malim Sdn. Bhd. : quality systems, audits and awards in achieving the International Organization for Standardization (ISO) / Nursyazana Ismail
by: Ismail, Nursyazana
Published: (2011) -
Composition of Schedulability Analyses for Real-Time Multiprocessor Systems
by: Lee, Jinkyu, et al.
Published: (2018) -
The contributors of adaptive performance at Hicom Automotive Manufacturers (Malaysia) Sdn. Bhd. / Nur Sharina Burhan
by: Burhan, Nur Sharina
Published: (2018) -
Relationship between the workplace
environments with the level of employees
productivity in Pejabat Agama Daerah Besut / Nor Hidayah Mohmd Salleh
by: Mohmd Salleh, Nor Hidayah
Published: (2017)