Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan

The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Projec...

Full description

Bibliographic Details
Main Author: Maslan, Masfarizan
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF
_version_ 1825733680949100544
author Maslan, Masfarizan
author_facet Maslan, Masfarizan
author_sort Maslan, Masfarizan
collection UITM
description The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Project between Rawang and Ipoh has been choose as a case study. Vibro replacement with stone column is a subsoil improvement method at which large sized columns of coarse backfill material install in the soil by means of special depth vibrators.
first_indexed 2024-03-06T01:20:43Z
format Thesis
id uitm.eprints-770
institution Universiti Teknologi MARA
language English
last_indexed 2024-03-06T01:20:43Z
publishDate 2003
record_format dspace
spelling uitm.eprints-7702022-10-09T23:46:40Z https://ir.uitm.edu.my/id/eprint/2770/ Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan Maslan, Masfarizan Highway design. Interchanges and intersections The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Project between Rawang and Ipoh has been choose as a case study. Vibro replacement with stone column is a subsoil improvement method at which large sized columns of coarse backfill material install in the soil by means of special depth vibrators. 2003-04-02 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan. (2003) Degree thesis, thesis, Universiti Teknologi Mara (UiTM).
spellingShingle Highway design. Interchanges and intersections
Maslan, Masfarizan
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title_full Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title_fullStr Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title_full_unstemmed Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title_short Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
title_sort ground improvement constructions with particular reference to stone column case study electrified double track project between rawang and ipoh masfarizan maslan
topic Highway design. Interchanges and intersections
url https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF
work_keys_str_mv AT maslanmasfarizan groundimprovementconstructionswithparticularreferencetostonecolumncasestudyelectrifieddoubletrackprojectbetweenrawangandipohmasfarizanmaslan