Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Projec...
Main Author: | Maslan, Masfarizan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF |
Similar Items
-
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996) -
Preliminary study on waste management for implementation of green highway / Asmalia Che Ahmad ... [et al.]
by: Asmalia, Che Ahmad, et al.
Published: (2015) -
Estimation of the design elements of horizontal alignment by the method of least squares/Jalina Rabi
by: Rabi, Jalina
Published: (2006) -
Modeling of traffic movements in Seberang Perai Utara, Penang, Malaysia using OmniTRANS / Muhamad Fairul Samsudin
by: Samsudin, Muhamad Fairul
Published: (2006) -
The effect of reclaimed asphalt pavement (RAP) proportion on strength properties of a full depth recycling pavement / Roziawati Razali
by: Razali, Roziawati
Published: (2010)