Performance improvement through value stream mapping – a manufacturing case study

The successfulness of Value Stream Mapping (VSM) as a tool for taking a snapshot of the production flow efficiency is well established. The development of a large-scale visual map of processes and their interactions is beneficial for problem analysis and subsequent solution. Through VSM, managers ga...

Full description

Bibliographic Details
Main Authors: Bugvi, Salman Abubakar, Hameed, Khurram, Jamil, M. Fawad, Irfan, Ali, Murtaza, Shahid, Qaiser, Muhammad, Bilal, Muhammad
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2021
Online Access:http://journalarticle.ukm.my/18953/1/22.pdf
_version_ 1796932952363368448
author Bugvi, Salman Abubakar
Hameed, Khurram
Jamil, M. Fawad
Irfan, Ali
Murtaza, Shahid
Qaiser, Muhammad
Bilal, Muhammad
author_facet Bugvi, Salman Abubakar
Hameed, Khurram
Jamil, M. Fawad
Irfan, Ali
Murtaza, Shahid
Qaiser, Muhammad
Bilal, Muhammad
author_sort Bugvi, Salman Abubakar
collection UKM
description The successfulness of Value Stream Mapping (VSM) as a tool for taking a snapshot of the production flow efficiency is well established. The development of a large-scale visual map of processes and their interactions is beneficial for problem analysis and subsequent solution. Through VSM, managers gain a deeper understanding of the organization processes carried out in coordination with people in a system approach. A case study was conducted at a Small and Medium Enterprise (SME) in Pakistan which manufactures ceiling fan winding machines. The aim of this study was to explore the possibilities of shortening the lead-time, waste and highlight important strategies, steps which could be undertaken by management for improvement in productivity, cost and quality. The study maps the organization systematically through the use of VSM. The Lean Implementation Techniques (LIT) steps were followed with identification of value stream process, lean metrics, mapping of current state and proposing an improved future state value stream map. The intervention suggested is layout modification by reducing 7 stations to 6 stations and streamlining the operations. The layout modification results in lower defects, controlling overproduction, managing inventory buffers from a linear approach to an optimized level. This also resulted in reduction of processing time of each unit by around 19 % and the production lead time of 100 units by around 21%. This study through VSM proposes improvement by enforcing pull system, supplier relations, modifying layout and production processes, Just in Time (JIT) delivery of materials and parts, scheduling transport resources efficiently and reducing inventory buffers.
first_indexed 2024-03-06T04:40:02Z
format Article
id ukm.eprints-18953
institution Universiti Kebangsaan Malaysia
language English
last_indexed 2024-03-06T04:40:02Z
publishDate 2021
publisher Penerbit Universiti Kebangsaan Malaysia
record_format dspace
spelling ukm.eprints-189532022-07-13T07:27:13Z http://journalarticle.ukm.my/18953/ Performance improvement through value stream mapping – a manufacturing case study Bugvi, Salman Abubakar Hameed, Khurram Jamil, M. Fawad Irfan, Ali Murtaza, Shahid Qaiser, Muhammad Bilal, Muhammad The successfulness of Value Stream Mapping (VSM) as a tool for taking a snapshot of the production flow efficiency is well established. The development of a large-scale visual map of processes and their interactions is beneficial for problem analysis and subsequent solution. Through VSM, managers gain a deeper understanding of the organization processes carried out in coordination with people in a system approach. A case study was conducted at a Small and Medium Enterprise (SME) in Pakistan which manufactures ceiling fan winding machines. The aim of this study was to explore the possibilities of shortening the lead-time, waste and highlight important strategies, steps which could be undertaken by management for improvement in productivity, cost and quality. The study maps the organization systematically through the use of VSM. The Lean Implementation Techniques (LIT) steps were followed with identification of value stream process, lean metrics, mapping of current state and proposing an improved future state value stream map. The intervention suggested is layout modification by reducing 7 stations to 6 stations and streamlining the operations. The layout modification results in lower defects, controlling overproduction, managing inventory buffers from a linear approach to an optimized level. This also resulted in reduction of processing time of each unit by around 19 % and the production lead time of 100 units by around 21%. This study through VSM proposes improvement by enforcing pull system, supplier relations, modifying layout and production processes, Just in Time (JIT) delivery of materials and parts, scheduling transport resources efficiently and reducing inventory buffers. Penerbit Universiti Kebangsaan Malaysia 2021 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/18953/1/22.pdf Bugvi, Salman Abubakar and Hameed, Khurram and Jamil, M. Fawad and Irfan, Ali and Murtaza, Shahid and Qaiser, Muhammad and Bilal, Muhammad (2021) Performance improvement through value stream mapping – a manufacturing case study. Jurnal Kejuruteraan, 33 (4). pp. 1007-1018. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-334-2021/
spellingShingle Bugvi, Salman Abubakar
Hameed, Khurram
Jamil, M. Fawad
Irfan, Ali
Murtaza, Shahid
Qaiser, Muhammad
Bilal, Muhammad
Performance improvement through value stream mapping – a manufacturing case study
title Performance improvement through value stream mapping – a manufacturing case study
title_full Performance improvement through value stream mapping – a manufacturing case study
title_fullStr Performance improvement through value stream mapping – a manufacturing case study
title_full_unstemmed Performance improvement through value stream mapping – a manufacturing case study
title_short Performance improvement through value stream mapping – a manufacturing case study
title_sort performance improvement through value stream mapping a manufacturing case study
url http://journalarticle.ukm.my/18953/1/22.pdf
work_keys_str_mv AT bugvisalmanabubakar performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT hameedkhurram performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT jamilmfawad performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT irfanali performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT murtazashahid performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT qaisermuhammad performanceimprovementthroughvaluestreammappingamanufacturingcasestudy
AT bilalmuhammad performanceimprovementthroughvaluestreammappingamanufacturingcasestudy