Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine

The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journal...

Full description

Bibliographic Details
Main Authors: Kumar, Pagare Ajay, Neeraj, Kumar
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2022
Online Access:http://journalarticle.ukm.my/20326/1/06.pdf
_version_ 1796933231254175744
author Kumar, Pagare Ajay
Neeraj, Kumar
author_facet Kumar, Pagare Ajay
Neeraj, Kumar
author_sort Kumar, Pagare Ajay
collection UKM
description The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journals. The study derives a further framework model comprising three strategies (Supply chain management, inventory management, and maintenance engineering) to improve rate of production. The aforesaid process is used to identify problems that occur during machine breakdown. The paper provides a research substitute machine to manage problems during breakdown of machines so that production is not hindered.
first_indexed 2024-03-06T04:44:03Z
format Article
id ukm.eprints-20326
institution Universiti Kebangsaan Malaysia
language English
last_indexed 2024-03-06T04:44:03Z
publishDate 2022
publisher Penerbit Universiti Kebangsaan Malaysia
record_format dspace
spelling ukm.eprints-203262022-11-02T01:10:02Z http://journalarticle.ukm.my/20326/ Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine Kumar, Pagare Ajay Neeraj, Kumar The research attempt to increase flexibility in shop floor and improve rate of production through maintenance engineering policies. The research is grounded on analysis of data collected from manufacturing based MSMEs and review of literature and data of spare parts published in referred journals. The study derives a further framework model comprising three strategies (Supply chain management, inventory management, and maintenance engineering) to improve rate of production. The aforesaid process is used to identify problems that occur during machine breakdown. The paper provides a research substitute machine to manage problems during breakdown of machines so that production is not hindered. Penerbit Universiti Kebangsaan Malaysia 2022 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/20326/1/06.pdf Kumar, Pagare Ajay and Neeraj, Kumar (2022) Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine. Jurnal Kejuruteraan, 34 (4). pp. 585-589. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-3404-2022/
spellingShingle Kumar, Pagare Ajay
Neeraj, Kumar
Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_full Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_fullStr Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_full_unstemmed Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_short Development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
title_sort development of framework to increase flexibility in shop floor and maximize production rate using substitute machine
url http://journalarticle.ukm.my/20326/1/06.pdf
work_keys_str_mv AT kumarpagareajay developmentofframeworktoincreaseflexibilityinshopfloorandmaximizeproductionrateusingsubstitutemachine
AT neerajkumar developmentofframeworktoincreaseflexibilityinshopfloorandmaximizeproductionrateusingsubstitutemachine