Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry

The study is an assessment of time, cost and quality management in the Nigerian construction industry, and its objective is to examine the impact of non-implementation of these factors in the Nigerian construction industry. This study is limited to the view of a convenient sample of professional i....

Full description

Bibliographic Details
Main Author: Ibironke, Olajide Timothy
Format: Article
Language:English
Published: Penerbit UKM 2012
Online Access:http://journalarticle.ukm.my/6560/1/50-84-1-SM.pdf
_version_ 1825725817836011520
author Ibironke, Olajide Timothy
author_facet Ibironke, Olajide Timothy
author_sort Ibironke, Olajide Timothy
collection UKM
description The study is an assessment of time, cost and quality management in the Nigerian construction industry, and its objective is to examine the impact of non-implementation of these factors in the Nigerian construction industry. This study is limited to the view of a convenient sample of professional i.e. Architects, Builders, Quantity Surveyors and Engineers. The method used to collect data were questionnaire and interview while the data collected were subjected to descriptive statistical analysis using percentage, mean score and frequency. The study revealed that the impact of non compliance with time,costs and quality management procedures is building collapse as evident in the Nigerian constructions industry today. Others includes high cost of construction, which make building constructions very high thus leading to project abandonment which constitute nuisance to the built environment and this can lead to lost of public confidence in the industry. The study recommends that modalities should be put in place by government and concerned professional bodies to guide against fraud, the relevant authority like SON (Standard Organization of Nigeria) should wake up from slumber and come up with standards for construction component and lastly the National Building Code should be adopted for use in the building construction in all its ramifications.
first_indexed 2024-03-06T04:01:23Z
format Article
id ukm.eprints-6560
institution Universiti Kebangsaan Malaysia
language English
last_indexed 2024-03-06T04:01:23Z
publishDate 2012
publisher Penerbit UKM
record_format dspace
spelling ukm.eprints-65602016-12-14T06:41:32Z http://journalarticle.ukm.my/6560/ Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry Ibironke, Olajide Timothy The study is an assessment of time, cost and quality management in the Nigerian construction industry, and its objective is to examine the impact of non-implementation of these factors in the Nigerian construction industry. This study is limited to the view of a convenient sample of professional i.e. Architects, Builders, Quantity Surveyors and Engineers. The method used to collect data were questionnaire and interview while the data collected were subjected to descriptive statistical analysis using percentage, mean score and frequency. The study revealed that the impact of non compliance with time,costs and quality management procedures is building collapse as evident in the Nigerian constructions industry today. Others includes high cost of construction, which make building constructions very high thus leading to project abandonment which constitute nuisance to the built environment and this can lead to lost of public confidence in the industry. The study recommends that modalities should be put in place by government and concerned professional bodies to guide against fraud, the relevant authority like SON (Standard Organization of Nigeria) should wake up from slumber and come up with standards for construction component and lastly the National Building Code should be adopted for use in the building construction in all its ramifications. Penerbit UKM 2012 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/6560/1/50-84-1-SM.pdf Ibironke, Olajide Timothy (2012) Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry. Journal of Building Performance, 3 (1). pp. 9-15. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/index.html
spellingShingle Ibironke, Olajide Timothy
Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title_full Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title_fullStr Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title_full_unstemmed Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title_short Impact of non-implementation of time, cost and quality management procedures in the Nigerian construction industry
title_sort impact of non implementation of time cost and quality management procedures in the nigerian construction industry
url http://journalarticle.ukm.my/6560/1/50-84-1-SM.pdf
work_keys_str_mv AT ibironkeolajidetimothy impactofnonimplementationoftimecostandqualitymanagementproceduresinthenigerianconstructionindustry