Impacts of common components in multistage production system under uncertain conditions
The work desires: i) to determine the optimum level of batch size in bottleneck facility and ii) to analyze the effect of common components on work-in-process (WIP) level and cycle time in a multistage production system under uncertainties. The uncertainty is created by machine breakdown and qualit...
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/11274/1/161_wazed.pdf |
Summary: | The work desires: i) to determine the optimum level of batch size in bottleneck facility and ii) to analyze the effect
of common components on work-in-process (WIP) level and cycle time in a multistage production system under uncertainties. The uncertainty is created by machine breakdown and quality variation. Few simulation models are
developed based on a live case from a company. The models are verified and validated with the historical data from
the company and by face validity. Taguchi approach for orthogonal array is used in designing experiments and these
are executed in WITNESS. It is observed that the variation in level of common component in the system has
significant impact on the production WIP level and cycle time. The main contribution of this research is determination of the optimal level of batch size in a bottleneck resource under the uncertainties. This approach can be generalized to any multistage production system, regardless of the precedence relationships among the various
production stages in the system. |
---|