A production-repair inventory model with time-varying demand and multiple setups

demand for a finished product over a known and finite planning horizon by supplying both new and repaired items. New items are fabricated from a single type of raw material procured from external suppliers. while used items are collected from the customers and then repaired to a condition that is as...

Full description

Bibliographic Details
Main Authors: Omar, M., Yeo, I.
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.um.edu.my/11398/1/0001.pdf
_version_ 1796946235075067904
author Omar, M.
Yeo, I.
author_facet Omar, M.
Yeo, I.
author_sort Omar, M.
collection UM
description demand for a finished product over a known and finite planning horizon by supplying both new and repaired items. New items are fabricated from a single type of raw material procured from external suppliers. while used items are collected from the customers and then repaired to a condition that is as good- as-new. During each time interval. new items and used items are produced from multiple production and repair runs. The problem is to determine a joint policy for raw materials procurement. new items fabrication, and used items repair such that the total relevant cost of the model is minimized. We also proposed a numerical solution procedure and we tested the model with some numerical examples and a simple sensitivity analysis.
first_indexed 2024-03-06T05:28:36Z
format Conference or Workshop Item
id um.eprints-11398
institution Universiti Malaya
language English
last_indexed 2024-03-06T05:28:36Z
publishDate 2014
record_format dspace
spelling um.eprints-113982014-12-18T03:08:52Z http://eprints.um.edu.my/11398/ A production-repair inventory model with time-varying demand and multiple setups Omar, M. Yeo, I. QA Mathematics demand for a finished product over a known and finite planning horizon by supplying both new and repaired items. New items are fabricated from a single type of raw material procured from external suppliers. while used items are collected from the customers and then repaired to a condition that is as good- as-new. During each time interval. new items and used items are produced from multiple production and repair runs. The problem is to determine a joint policy for raw materials procurement. new items fabrication, and used items repair such that the total relevant cost of the model is minimized. We also proposed a numerical solution procedure and we tested the model with some numerical examples and a simple sensitivity analysis. 2014-08 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.um.edu.my/11398/1/0001.pdf Omar, M. and Yeo, I. (2014) A production-repair inventory model with time-varying demand and multiple setups. In: International Symposium on Inventories ISIR 2014, 18-22 Aug 2014, Budapest, Hungary.
spellingShingle QA Mathematics
Omar, M.
Yeo, I.
A production-repair inventory model with time-varying demand and multiple setups
title A production-repair inventory model with time-varying demand and multiple setups
title_full A production-repair inventory model with time-varying demand and multiple setups
title_fullStr A production-repair inventory model with time-varying demand and multiple setups
title_full_unstemmed A production-repair inventory model with time-varying demand and multiple setups
title_short A production-repair inventory model with time-varying demand and multiple setups
title_sort production repair inventory model with time varying demand and multiple setups
topic QA Mathematics
url http://eprints.um.edu.my/11398/1/0001.pdf
work_keys_str_mv AT omarm aproductionrepairinventorymodelwithtimevaryingdemandandmultiplesetups
AT yeoi aproductionrepairinventorymodelwithtimevaryingdemandandmultiplesetups
AT omarm productionrepairinventorymodelwithtimevaryingdemandandmultiplesetups
AT yeoi productionrepairinventorymodelwithtimevaryingdemandandmultiplesetups