Eliminating concrete cover separation of NSM strengthened beams by CFRP end anchorage
Upgrading or strengthening of existing reinforced concrete (RC) infrastructure is an emerging demand nowadays. Near Surface Mounted (NSM) technique is very promising approach for flexural strengthening of RC members. However, premature failure such as concrete cover separation failure have been a ma...
Main Authors: | Hosen, M.A., Jumaat, Mohd Zamin, Islam, A.B.M.S., Kamruzzaman, M., Huda, M.N., Soeb, M.R. |
---|---|
Format: | Article |
Published: |
Techno-Press
2015
|
Subjects: |
Similar Items
-
Inclusion of CFRP - epoxy composite for end anchorage in NSM-epoxy strengthened beams
by: Hosen, M.A., et al.
Published: (2015) -
Automated serviceability prediction of NSM strengthened structure using a fuzzy logic expert system
by: Darain, K.M.U., et al.
Published: (2015) -
Automated serviceability prediction of NSM strengthened structure using a fuzzy logic expert system
by: Darain, K.M.U., et al.
Published: (2015) -
Optimization of intermediate anchors to eliminate premature shear failure of CFRP laminate flexurally strengthened R.C beams
by: Jumaat, Mohd Zamin, et al.
Published: (2011) -
Eliminating premature end peeling of flexurally strengthened reinforced concrete beams
by: Alam, M.A., et al.
Published: (2009)