Relationship between Predetermined Maintenance Interval and Maintenance Performance
Currently, lack of preventive measure is the problem that implicates poor maintenance outcome. Scheduled maintenance is claimed as a maintenance strategy to tackle the problem. However, the effectiveness of scheduled maintenance can be greatly influenced by the length of predetermined maintenance in...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Trans Tech Publications
2016
|
Subjects: | |
Online Access: | http://eprints.um.edu.my/17665/1/Post-Print.pdf |
_version_ | 1825720967278624768 |
---|---|
author | Au-Yong, C.P. Ali, A.S. Ahmad, F. |
author_facet | Au-Yong, C.P. Ali, A.S. Ahmad, F. |
author_sort | Au-Yong, C.P. |
collection | UM |
description | Currently, lack of preventive measure is the problem that implicates poor maintenance outcome. Scheduled maintenance is claimed as a maintenance strategy to tackle the problem. However, the effectiveness of scheduled maintenance can be greatly influenced by the length of predetermined maintenance interval. Thus, this paper aims to study the relationship between length of predetermined maintenance interval and maintenance performance. The literature review identifies the length of predetermined maintenance interval as an importance characteristic of scheduled maintenance strategy. A quantitative approach is adopted and carried out through questionnaire survey. Subsequently, descriptive analysis and correlation analysis are used to analyse the collected data. Then, research result demonstrates that the length of predetermined maintenance interval is significantly correlated to the maintenance performance. The length of predetermined maintenance interval must be considered in maintenance planning and execution. The research recommends continuous monitoring or regular inspection of building systems and components to identify their condition and update the length of predetermined maintenance interval regularly. Consequently, the effective maintenance execution helps to avoid systems failure occurs and optimises maintenance performance. |
first_indexed | 2024-03-06T05:43:11Z |
format | Article |
id | um.eprints-17665 |
institution | Universiti Malaya |
language | English |
last_indexed | 2024-03-06T05:43:11Z |
publishDate | 2016 |
publisher | Trans Tech Publications |
record_format | dspace |
spelling | um.eprints-176652017-09-13T04:07:12Z http://eprints.um.edu.my/17665/ Relationship between Predetermined Maintenance Interval and Maintenance Performance Au-Yong, C.P. Ali, A.S. Ahmad, F. TH Building construction Currently, lack of preventive measure is the problem that implicates poor maintenance outcome. Scheduled maintenance is claimed as a maintenance strategy to tackle the problem. However, the effectiveness of scheduled maintenance can be greatly influenced by the length of predetermined maintenance interval. Thus, this paper aims to study the relationship between length of predetermined maintenance interval and maintenance performance. The literature review identifies the length of predetermined maintenance interval as an importance characteristic of scheduled maintenance strategy. A quantitative approach is adopted and carried out through questionnaire survey. Subsequently, descriptive analysis and correlation analysis are used to analyse the collected data. Then, research result demonstrates that the length of predetermined maintenance interval is significantly correlated to the maintenance performance. The length of predetermined maintenance interval must be considered in maintenance planning and execution. The research recommends continuous monitoring or regular inspection of building systems and components to identify their condition and update the length of predetermined maintenance interval regularly. Consequently, the effective maintenance execution helps to avoid systems failure occurs and optimises maintenance performance. Trans Tech Publications 2016 Article PeerReviewed application/pdf en cc_by_nc_sa http://eprints.um.edu.my/17665/1/Post-Print.pdf Au-Yong, C.P. and Ali, A.S. and Ahmad, F. (2016) Relationship between Predetermined Maintenance Interval and Maintenance Performance. Applied Mechanics and Materials, 845. pp. 305-310. ISSN 1660-9336, DOI https://doi.org/10.4028/www.scientific.net/AMM.845.305 <https://doi.org/10.4028/www.scientific.net/AMM.845.305>. https://www.scientific.net/AMM.845.305 doi:10.4028/www.scientific.net/AMM.845.305 |
spellingShingle | TH Building construction Au-Yong, C.P. Ali, A.S. Ahmad, F. Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title | Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title_full | Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title_fullStr | Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title_full_unstemmed | Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title_short | Relationship between Predetermined Maintenance Interval and Maintenance Performance |
title_sort | relationship between predetermined maintenance interval and maintenance performance |
topic | TH Building construction |
url | http://eprints.um.edu.my/17665/1/Post-Print.pdf |
work_keys_str_mv | AT auyongcp relationshipbetweenpredeterminedmaintenanceintervalandmaintenanceperformance AT alias relationshipbetweenpredeterminedmaintenanceintervalandmaintenanceperformance AT ahmadf relationshipbetweenpredeterminedmaintenanceintervalandmaintenanceperformance |