Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections

The utilisation of beam to concrete-filled tubular (CFT) column bolted construction remains limited due to the severe slippage of bolts, column surface deformation and low moment-resisting capacity. This study proposes a novel blind bolt, known as the TubeBolt, for beam to CFT column connections. Te...

Full description

Bibliographic Details
Main Authors: Jeddi, Mahdi Zeinizadeh, Ramli Sulong, Nor Hafizah
Format: Article
Published: Elsevier 2018
Subjects:
_version_ 1825721742917632000
author Jeddi, Mahdi Zeinizadeh
Ramli Sulong, Nor Hafizah
author_facet Jeddi, Mahdi Zeinizadeh
Ramli Sulong, Nor Hafizah
author_sort Jeddi, Mahdi Zeinizadeh
collection UM
description The utilisation of beam to concrete-filled tubular (CFT) column bolted construction remains limited due to the severe slippage of bolts, column surface deformation and low moment-resisting capacity. This study proposes a novel blind bolt, known as the TubeBolt, for beam to CFT column connections. Ten pull-out test specimens were evaluated under tensile monotonic loading. Bolt type, bolt diameter, end anchor member, hollow tube wall thickness and bolt hole diameter were varied for the test. The failure modes, anchorage performance, load-carrying capacity, strength, slippage and elongation of the bolts were analysed. The behaviour of the TubeBolt specimens was compared with that of the Extended Hollo-bolt specimens under the same condition. Experimental results indicated that the novel TubeBolt in concrete-filled tubes exhibited excellent anchorage performance, higher strength and less slip and elongation until the failure state was reached.
first_indexed 2024-03-06T05:55:00Z
format Article
id um.eprints-21740
institution Universiti Malaya
last_indexed 2024-03-06T05:55:00Z
publishDate 2018
publisher Elsevier
record_format dspace
spelling um.eprints-217402019-08-02T01:37:43Z http://eprints.um.edu.my/21740/ Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections Jeddi, Mahdi Zeinizadeh Ramli Sulong, Nor Hafizah TA Engineering (General). Civil engineering (General) The utilisation of beam to concrete-filled tubular (CFT) column bolted construction remains limited due to the severe slippage of bolts, column surface deformation and low moment-resisting capacity. This study proposes a novel blind bolt, known as the TubeBolt, for beam to CFT column connections. Ten pull-out test specimens were evaluated under tensile monotonic loading. Bolt type, bolt diameter, end anchor member, hollow tube wall thickness and bolt hole diameter were varied for the test. The failure modes, anchorage performance, load-carrying capacity, strength, slippage and elongation of the bolts were analysed. The behaviour of the TubeBolt specimens was compared with that of the Extended Hollo-bolt specimens under the same condition. Experimental results indicated that the novel TubeBolt in concrete-filled tubes exhibited excellent anchorage performance, higher strength and less slip and elongation until the failure state was reached. Elsevier 2018 Article PeerReviewed Jeddi, Mahdi Zeinizadeh and Ramli Sulong, Nor Hafizah (2018) Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections. Thin-Walled Structures, 124. pp. 402-414. ISSN 0263-8231, DOI https://doi.org/10.1016/j.tws.2017.12.028 <https://doi.org/10.1016/j.tws.2017.12.028>. https://doi.org/10.1016/j.tws.2017.12.028 doi:10.1016/j.tws.2017.12.028
spellingShingle TA Engineering (General). Civil engineering (General)
Jeddi, Mahdi Zeinizadeh
Ramli Sulong, Nor Hafizah
Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title_full Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title_fullStr Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title_full_unstemmed Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title_short Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
title_sort pull out performance of a novel anchor blind bolt tubebolt for beam to concrete filled tubular cft column bolted connections
topic TA Engineering (General). Civil engineering (General)
work_keys_str_mv AT jeddimahdizeinizadeh pulloutperformanceofanovelanchorblindbolttubeboltforbeamtoconcretefilledtubularcftcolumnboltedconnections
AT ramlisulongnorhafizah pulloutperformanceofanovelanchorblindbolttubeboltforbeamtoconcretefilledtubularcftcolumnboltedconnections