Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
The utilisation of beam to concrete-filled tubular (CFT) column bolted construction remains limited due to the severe slippage of bolts, column surface deformation and low moment-resisting capacity. This study proposes a novel blind bolt, known as the TubeBolt, for beam to CFT column connections. Te...
Main Authors: | Jeddi, Mahdi Zeinizadeh, Ramli Sulong, Nor Hafizah |
---|---|
Format: | Article |
Published: |
Elsevier
2018
|
Subjects: |
Similar Items
-
Smart bolt for digital bolted joint monitoring system
by: Mohd Hafizi, Zohari, et al.
Published: (2021) -
XFEM modelling in multi-bolted joints using a unified bolt preload
by: Supar, Khairi, et al.
Published: (2019) -
Tightening and loosening of bolted joint
by: Tanra, Ivan
Published: (2013) -
Lightning: a bolt from the blue
by: Ab Kadir, Mohd Zainal Abidin
Published: (2017) -
Rock bolt modelling in rock cavern
by: Aziz, Noorul
Published: (2017)