Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park

Walini is an area with potential for development into a technology park based on its population and economic growth. This paper aims to analyse the investment feasibility of the development of Walini Technology Park and its optimum funding scheme. The life-cycle analysis approach is used to evaluate...

Full description

Bibliographic Details
Main Authors: Berawi, Mohammed Ali, Nabila, Asifa, Gunawan, Gunawan, Miraj, Perdana, Abdul-Rahman, Hamzah, Berawi, Abdur Rohim Boy
Format: Article
Published: Faculty of Engineering, Universitas Indonesia 2018
Subjects:
_version_ 1825721848206196736
author Berawi, Mohammed Ali
Nabila, Asifa
Gunawan, Gunawan
Miraj, Perdana
Abdul-Rahman, Hamzah
Berawi, Abdur Rohim Boy
author_facet Berawi, Mohammed Ali
Nabila, Asifa
Gunawan, Gunawan
Miraj, Perdana
Abdul-Rahman, Hamzah
Berawi, Abdur Rohim Boy
author_sort Berawi, Mohammed Ali
collection UM
description Walini is an area with potential for development into a technology park based on its population and economic growth. This paper aims to analyse the investment feasibility of the development of Walini Technology Park and its optimum funding scheme. The life-cycle analysis approach is used to evaluate operation and maintenance (OM) costs and the system dynamics technique to generate revenue. The study will focus on examining scenario alternatives to determine an optimum public-private partnership (PPP) scheme. The results show that development of Walini would require an investment cost of 151 trillion rupiahs (US$ 9.97 billion) and OM costs of 353 trillion rupiahs (US$ 23.3 billion). The development would generate a revenue of 75 billion dollars, with a 35-year concession period. 42 scenarios were considered in order to obtain that with optimal Internal Rate of Return (IRR) values. The optimal IRR score is 15.57%, with a private share of around 49.89% of the initial costs, 60.08% of operational and maintenance costs, and 80.06% of revenue.
first_indexed 2024-03-06T05:56:36Z
format Article
id um.eprints-22316
institution Universiti Malaya
last_indexed 2024-03-06T05:56:36Z
publishDate 2018
publisher Faculty of Engineering, Universitas Indonesia
record_format dspace
spelling um.eprints-223162019-09-13T01:47:34Z http://eprints.um.edu.my/22316/ Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park Berawi, Mohammed Ali Nabila, Asifa Gunawan, Gunawan Miraj, Perdana Abdul-Rahman, Hamzah Berawi, Abdur Rohim Boy TA Engineering (General). Civil engineering (General) TH Building construction Walini is an area with potential for development into a technology park based on its population and economic growth. This paper aims to analyse the investment feasibility of the development of Walini Technology Park and its optimum funding scheme. The life-cycle analysis approach is used to evaluate operation and maintenance (OM) costs and the system dynamics technique to generate revenue. The study will focus on examining scenario alternatives to determine an optimum public-private partnership (PPP) scheme. The results show that development of Walini would require an investment cost of 151 trillion rupiahs (US$ 9.97 billion) and OM costs of 353 trillion rupiahs (US$ 23.3 billion). The development would generate a revenue of 75 billion dollars, with a 35-year concession period. 42 scenarios were considered in order to obtain that with optimal Internal Rate of Return (IRR) values. The optimal IRR score is 15.57%, with a private share of around 49.89% of the initial costs, 60.08% of operational and maintenance costs, and 80.06% of revenue. Faculty of Engineering, Universitas Indonesia 2018 Article PeerReviewed Berawi, Mohammed Ali and Nabila, Asifa and Gunawan, Gunawan and Miraj, Perdana and Abdul-Rahman, Hamzah and Berawi, Abdur Rohim Boy (2018) Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park. International Journal of Technology, 9 (7). pp. 1469-1479. ISSN 2086-9614, DOI https://doi.org/10.14716/ijtech.v9i7.2588 <https://doi.org/10.14716/ijtech.v9i7.2588>. https://doi.org/10.14716/ijtech.v9i7.2588 doi:10.14716/ijtech.v9i7.2588
spellingShingle TA Engineering (General). Civil engineering (General)
TH Building construction
Berawi, Mohammed Ali
Nabila, Asifa
Gunawan, Gunawan
Miraj, Perdana
Abdul-Rahman, Hamzah
Berawi, Abdur Rohim Boy
Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title_full Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title_fullStr Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title_full_unstemmed Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title_short Analysis of Life Cycle Cost and Public-Private Partnership in the Development of Walini City as Technology Park
title_sort analysis of life cycle cost and public private partnership in the development of walini city as technology park
topic TA Engineering (General). Civil engineering (General)
TH Building construction
work_keys_str_mv AT berawimohammedali analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark
AT nabilaasifa analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark
AT gunawangunawan analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark
AT mirajperdana analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark
AT abdulrahmanhamzah analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark
AT berawiabdurrohimboy analysisoflifecyclecostandpublicprivatepartnershipinthedevelopmentofwalinicityastechnologypark