A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation
This paper presents a new forecasting model to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Perform...
Main Authors: | Attarzadeh, I., Hock, O.S. |
---|---|
Format: | Conference or Workshop Item |
Published: |
2009
|
Subjects: |
Similar Items
-
Implementation and evaluation of earned value index to achieve an accurate project time and cost estimation and improve "Earned Value Management System"
by: Attarzadeh, I., et al.
Published: (2009) -
Using enhancement method to improve earned value index to achieve an accurate project time and cost estimation
by: Attarzadeh, I., et al.
Published: (2009) -
New direction in project management success: base on smart methodology selection
by: Attarzadeh, I., et al.
Published: (2008) -
An accurate continuous hybrid block Method for the Direct Solution of general second initial value problem
by: Abdelrahim, Ra`ft, et al.
Published: (2019) -
Forecasting models for drought index using empirical wavelet transform and stochastic reconstruction approach
by: Shaari, Muhammad Akram
Published: (2021)