Implementation and evaluation of earned value index to achieve an accurate project time and cost estimation and improve "Earned Value Management System"

This paper presents an implementation and evaluation of Earned Value (EV) method of projects to improve earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index...

Full description

Bibliographic Details
Main Authors: Attarzadeh, I., Hock, O.S.
Format: Conference or Workshop Item
Published: 2009
Subjects:
Description
Summary:This paper presents an implementation and evaluation of Earned Value (EV) method of projects to improve earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 - Visual Basic NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.