Risk of late payment in the Malaysian construction industry

The purpose of this study is to identify the underlying causes of late payment from the contractors' perspective in the Malaysian construction industry and to recommend effective solutions to mitigate late payment problems. The target groups of respondents in this study were Grades G3, G5, G6 a...

Full description

Bibliographic Details
Main Authors: Kho, Mei Ye, Abdul-Rahman, Hamzah
Format: Article
Published: World Academy of Science, Engineering and Technology 2010
Subjects:
_version_ 1825721976420827136
author Kho, Mei Ye
Abdul-Rahman, Hamzah
author_facet Kho, Mei Ye
Abdul-Rahman, Hamzah
author_sort Kho, Mei Ye
collection UM
description The purpose of this study is to identify the underlying causes of late payment from the contractors' perspective in the Malaysian construction industry and to recommend effective solutions to mitigate late payment problems. The target groups of respondents in this study were Grades G3, G5, G6 and G7 contractors with specialization in building works and civil engineering works registered with the Construction Industry Development Board (CIDB) in Malaysia. Results from this study were analyzed with Statistical Package for the Social Science (SPSS 15.0). From this study, it was found that respondents have highest ranked five significant variables out of a total of forty-one variables which can caused late payment problems: a) cash flow problems due to deficiencies in client's management capacity (mean = 3.96); b) client's ineffective utilization of funds (mean = 3.88); c) scarcity of capital to finance the project (mean = 3.81); d) clients failure to generate income from bank when sales of houses do not hit the targeted amount (mean=3.72); and e) poor cash flow because of lack of proper process implementation, delay in releasing of the retention monies to contractor and delay in the evaluation and certification of interim and final payment (mean = 3.66).
first_indexed 2024-03-06T05:58:34Z
format Article
id um.eprints-22979
institution Universiti Malaya
last_indexed 2024-03-06T05:58:34Z
publishDate 2010
publisher World Academy of Science, Engineering and Technology
record_format dspace
spelling um.eprints-229792019-11-13T07:47:06Z http://eprints.um.edu.my/22979/ Risk of late payment in the Malaysian construction industry Kho, Mei Ye Abdul-Rahman, Hamzah TH Building construction The purpose of this study is to identify the underlying causes of late payment from the contractors' perspective in the Malaysian construction industry and to recommend effective solutions to mitigate late payment problems. The target groups of respondents in this study were Grades G3, G5, G6 and G7 contractors with specialization in building works and civil engineering works registered with the Construction Industry Development Board (CIDB) in Malaysia. Results from this study were analyzed with Statistical Package for the Social Science (SPSS 15.0). From this study, it was found that respondents have highest ranked five significant variables out of a total of forty-one variables which can caused late payment problems: a) cash flow problems due to deficiencies in client's management capacity (mean = 3.96); b) client's ineffective utilization of funds (mean = 3.88); c) scarcity of capital to finance the project (mean = 3.81); d) clients failure to generate income from bank when sales of houses do not hit the targeted amount (mean=3.72); and e) poor cash flow because of lack of proper process implementation, delay in releasing of the retention monies to contractor and delay in the evaluation and certification of interim and final payment (mean = 3.66). World Academy of Science, Engineering and Technology 2010 Article PeerReviewed Kho, Mei Ye and Abdul-Rahman, Hamzah (2010) Risk of late payment in the Malaysian construction industry. World Academy of Science, Engineering and Technology, 65. pp. 538-546. ISSN 2010-376X, https://publications.waset.org/1129/pdf
spellingShingle TH Building construction
Kho, Mei Ye
Abdul-Rahman, Hamzah
Risk of late payment in the Malaysian construction industry
title Risk of late payment in the Malaysian construction industry
title_full Risk of late payment in the Malaysian construction industry
title_fullStr Risk of late payment in the Malaysian construction industry
title_full_unstemmed Risk of late payment in the Malaysian construction industry
title_short Risk of late payment in the Malaysian construction industry
title_sort risk of late payment in the malaysian construction industry
topic TH Building construction
work_keys_str_mv AT khomeiye riskoflatepaymentinthemalaysianconstructionindustry
AT abdulrahmanhamzah riskoflatepaymentinthemalaysianconstructionindustry