Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia

In NLDC, the power system control centre of Tenaga Nasional Berhad, the use of on-line security assessment is still in the early stages. This paper undertakes a project implementation of a real time security assessment using VSAT and PSS/E. Real time data is obtained via NLDC's Westinghouse sys...

Full description

Bibliographic Details
Main Authors: Sreedharan, G., Moghavvemi, M.
Format: Conference or Workshop Item
Published: 2007
Subjects:
_version_ 1825719761516888064
author Sreedharan, G.
Moghavvemi, M.
author_facet Sreedharan, G.
Moghavvemi, M.
author_sort Sreedharan, G.
collection UM
description In NLDC, the power system control centre of Tenaga Nasional Berhad, the use of on-line security assessment is still in the early stages. This paper undertakes a project implementation of a real time security assessment using VSAT and PSS/E. Real time data is obtained via NLDC's Westinghouse system in a format of different platform. The data is then converted to PTI's version 29 power flow data before it is modified to meet VSAT input data needs. The real time power flow data is then solved using PSS/E and saved. The real time data is then channeled to VSAT to conduct N-1, N-2 and Transfer Analysis of the TNB power system at an interval of 10 minute cycle. The evaluated real time scenario results are then extracted and custom made to be viewed by the system operator using Microsoft Excel. The entire security assessment process is accomplished using PSS/E, VSAT, Visual Basic programming, IPLAN and Microsoft Schedule Task.
first_indexed 2024-03-06T05:24:42Z
format Conference or Workshop Item
id um.eprints-9767
institution Universiti Malaya
last_indexed 2024-03-06T05:24:42Z
publishDate 2007
record_format dspace
spelling um.eprints-97672017-11-23T02:00:07Z http://eprints.um.edu.my/9767/ Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia Sreedharan, G. Moghavvemi, M. TA Engineering (General). Civil engineering (General) In NLDC, the power system control centre of Tenaga Nasional Berhad, the use of on-line security assessment is still in the early stages. This paper undertakes a project implementation of a real time security assessment using VSAT and PSS/E. Real time data is obtained via NLDC's Westinghouse system in a format of different platform. The data is then converted to PTI's version 29 power flow data before it is modified to meet VSAT input data needs. The real time power flow data is then solved using PSS/E and saved. The real time data is then channeled to VSAT to conduct N-1, N-2 and Transfer Analysis of the TNB power system at an interval of 10 minute cycle. The evaluated real time scenario results are then extracted and custom made to be viewed by the system operator using Microsoft Excel. The entire security assessment process is accomplished using PSS/E, VSAT, Visual Basic programming, IPLAN and Microsoft Schedule Task. 2007-04 Conference or Workshop Item PeerReviewed Sreedharan, G. and Moghavvemi, M. (2007) Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia. In: 3rd IASTED Asian Conference on Power and Energy Systems, AsiaPES 2007, 2 - 4 April 2007, Phuket, Thailand.
spellingShingle TA Engineering (General). Civil engineering (General)
Sreedharan, G.
Moghavvemi, M.
Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title_full Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title_fullStr Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title_full_unstemmed Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title_short Real time security assessment in national load despatch centre, Tenaga Nasional Berhad, Malaysia
title_sort real time security assessment in national load despatch centre tenaga nasional berhad malaysia
topic TA Engineering (General). Civil engineering (General)
work_keys_str_mv AT sreedharang realtimesecurityassessmentinnationalloaddespatchcentretenaganasionalberhadmalaysia
AT moghavvemim realtimesecurityassessmentinnationalloaddespatchcentretenaganasionalberhadmalaysia