Tacheometry building survey: A comparison between EDM vs photogrammetry
Building surveying plays a vital role in a building construction project where it helps to establish the location and leveling of the building. There are several types of building surveying method such as tacheometry surveying, LIDAR surveying, theodolite surveying, plane table surveying, compass su...
Main Author: | |
---|---|
Format: | Academic Exercise |
Language: | English English |
Published: |
2022
|
Subjects: | |
Online Access: | https://eprints.ums.edu.my/id/eprint/35205/1/24%20PAGES.pdf https://eprints.ums.edu.my/id/eprint/35205/2/FULLTEXT.pdf |
_version_ | 1796911716393549824 |
---|---|
author | Lim Hong Yi |
author_facet | Lim Hong Yi |
author_sort | Lim Hong Yi |
collection | UMS |
description | Building surveying plays a vital role in a building construction project where it helps to establish the location and leveling of the building. There are several types of building surveying method such as tacheometry surveying, LIDAR surveying, theodolite surveying, plane table surveying, compass surveying, and photogrammetry surveying. Among of them, photogrammetry surveying is a method that brings a lot of benefits to the surveyor in term of speed and effectiveness. However, the accuracy of the photogrammetry surveying has been questioned by engineers. Thus, in this project, the main objective is to develop a procedure of carrying out photogrammetry surveying to create a 3D model of the library of University Malaysia Sabah (UMS), Kota Kinabalu, Sabah. On behalf of this, a tacheometry surveying will also be being conducted on the same building by using total station to do a comparison with photogrammetry survey in term of accuracy. The comparison of accuracy between both surveying methods will be done by using the principle of root mean square error and standard deviation. Lastly, the result of analysis was analyzed and found out that the horizontal distance of the 3D model from photogrammetry survey was classified as Band J while the vertical distance was classified as Band H. |
first_indexed | 2024-03-06T03:22:48Z |
format | Academic Exercise |
id | ums.eprints-35205 |
institution | Universiti Malaysia Sabah |
language | English English |
last_indexed | 2024-03-06T03:22:48Z |
publishDate | 2022 |
record_format | dspace |
spelling | ums.eprints-352052023-03-15T02:28:03Z https://eprints.ums.edu.my/id/eprint/35205/ Tacheometry building survey: A comparison between EDM vs photogrammetry Lim Hong Yi TH1-9745 Building construction Building surveying plays a vital role in a building construction project where it helps to establish the location and leveling of the building. There are several types of building surveying method such as tacheometry surveying, LIDAR surveying, theodolite surveying, plane table surveying, compass surveying, and photogrammetry surveying. Among of them, photogrammetry surveying is a method that brings a lot of benefits to the surveyor in term of speed and effectiveness. However, the accuracy of the photogrammetry surveying has been questioned by engineers. Thus, in this project, the main objective is to develop a procedure of carrying out photogrammetry surveying to create a 3D model of the library of University Malaysia Sabah (UMS), Kota Kinabalu, Sabah. On behalf of this, a tacheometry surveying will also be being conducted on the same building by using total station to do a comparison with photogrammetry survey in term of accuracy. The comparison of accuracy between both surveying methods will be done by using the principle of root mean square error and standard deviation. Lastly, the result of analysis was analyzed and found out that the horizontal distance of the 3D model from photogrammetry survey was classified as Band J while the vertical distance was classified as Band H. 2022 Academic Exercise NonPeerReviewed text en https://eprints.ums.edu.my/id/eprint/35205/1/24%20PAGES.pdf text en https://eprints.ums.edu.my/id/eprint/35205/2/FULLTEXT.pdf Lim Hong Yi (2022) Tacheometry building survey: A comparison between EDM vs photogrammetry. Univesiti Malaysia Sabah. (Unpublished) |
spellingShingle | TH1-9745 Building construction Lim Hong Yi Tacheometry building survey: A comparison between EDM vs photogrammetry |
title | Tacheometry building survey: A comparison between EDM vs photogrammetry |
title_full | Tacheometry building survey: A comparison between EDM vs photogrammetry |
title_fullStr | Tacheometry building survey: A comparison between EDM vs photogrammetry |
title_full_unstemmed | Tacheometry building survey: A comparison between EDM vs photogrammetry |
title_short | Tacheometry building survey: A comparison between EDM vs photogrammetry |
title_sort | tacheometry building survey a comparison between edm vs photogrammetry |
topic | TH1-9745 Building construction |
url | https://eprints.ums.edu.my/id/eprint/35205/1/24%20PAGES.pdf https://eprints.ums.edu.my/id/eprint/35205/2/FULLTEXT.pdf |
work_keys_str_mv | AT limhongyi tacheometrybuildingsurveyacomparisonbetweenedmvsphotogrammetry |