Feasibility of off-grid hybrid solar-wind energy for powering UMS peak communication repeater
Communication signal (Data and Sound) at UMS Peak and surrounding area including Kolej A and Kolej B was found very weak to no signal because of the location that located behind the hill. Therefore, communication repeater is suggested to be installed at this location. Since the UMS Peak is located a...
Main Author: | Zeckrey Jikurun |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2020
|
Subjects: | |
Online Access: | https://eprints.ums.edu.my/id/eprint/40686/1/24%20PAGES.pdf https://eprints.ums.edu.my/id/eprint/40686/2/FULLTEXT.pdf |
Similar Items
-
Feasibility of using solar pv waste heat to regenerate liquid desiccant in solar liquid desiccant air conditioning system
by: Zulkurnain Hassan, et al.
Published: (2021) -
Impact of photovoltaic grid-tied systems on national grid power factor in Palestine
by: Amer Braik, et al.
Published: (2022) -
Assessment of C-type Darrieus wind turbine under low wind speed condition
by: Mohd Suffian Misaran @ Misran, et al.
Published: (2019) -
Solar PV surface cooling using small companion solar cell-blowers
by: Hutharsan Mahendran, et al.
Published: (2021) -
Performance investigation of a mix wind turbine using a clutch mechanism at low wind speed condition
by: M J Jamanun, et al.
Published: (2017)