Unlocking the best timber harvesting operational planning with geospatial technology- log yard predetermination
Determining a log yard is essential in timber harvesting operational planning. Locating a log yard must be suitable, especially in dry and easily drained areas with an even slope. Since the timber harvesting operation with the principles of the selective management system (SMS) is restricted within...
Main Authors: | Jamhuri, Jamaluddin, Kamarudin, Norizah, Ismail, Mohd Hasmadi, Ahmad, Siti Azfanizam |
---|---|
Format: | Article |
Published: |
Forestry Department Peninsular Malaysia
2022
|
Similar Items
-
Optimizing timber transportation planning for timber harvesting using bees
algorithm in Malaysia
by: Jamaluddin, Jamhuri, et al.
Published: (2023) -
Bees algorithm for Forest transportation planning optimization in Malaysia
by: Jamaluddin, Jamhuri, et al.
Published: (2021) -
Optimal timber transportation planning in tropical hill forest using bees algorithm
by: Jamaluddin, Jamhuri
Published: (2022) -
Assessing timber extraction by using the RIMBAKA R2020- a timber harvester on a steep terrain in Ulu Jelai Forest Reserve, Peninsular Malaysia
by: Kamarudin, Norizah, et al.
Published: (2013) -
Remote sensing and GIS application in best harvest management planning in Sultan Idris Shah Forestry Education Centre (SISFEC), UPM
by: Kamarudin, Norizah, et al.
Published: (2013)