Numerical Modeling And Simulation In Electromagnetic Transient Program For Estimating Line Backflashover Performance
This paper presents a numerical modeling and simulation of 132 kV transmission line in electromagnetic transient program and later predicts the critical backflashover current, probability of the transformer damage and backflashover rate (BFR) when the lightning strikes close to the substation....
Main Authors: | Ab Kadir, Mohd Zainal Abidin, Mohd Nawi, Zawati, Sardi, Junainah |
---|---|
Format: | Article |
Language: | English English |
Published: |
2010
|
Online Access: | http://psasir.upm.edu.my/id/eprint/12120/2/Numerical%20Modeling%20And%20Simulation%20In%20Electromagnetic%20Transient%20Program%20For%20Estimating%20Line%20Backflashover%20Performance.pdf |
Similar Items
-
Simulation and Analysis of Lightning Backflashover for the 132 Kv Kuala Krai–Gua Musang Transmission Line Using PSCAD
by: Sardi, Junainah
Published: (2009) -
Backflashover analysis for 132 kV Kuala Krai-Gua Musang transmission line
by: Sardi, Junainah, et al.
Published: (2008) -
Backflashover rate of underbuilt 33 kV distribution overhead line under lightning condition
by: Mohd Nawi, Zawati
Published: (2012) -
Application of the insulator coordination gap models and effect of line design to backflashover studies
by: Ab Kadir, Mohd Zainal Abidin, et al.
Published: (2010) -
Implementation of the modified leader progression model in backflashover analysis
by: Ab Kadir, Mohd Zainal Abidin, et al.
Published: (2006)