Data acquisition system for Kenyir hydroelectric power plant.
The national electricity board of the States of Malaya has been using the state-of-the-art technology for process control at its power generating stations and control centres. Kenyir Hydroelectric Power Station, which is located in the state of Terengganu and has been constructed and commissioned re...
Main Authors: | Mansor, Mohamad Isa, Ghows Khan, Osman Khan |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
1986
|
Subjects: | |
Online Access: | http://psasir.upm.edu.my/id/eprint/18001/1/ID%2018001.pdf |
Similar Items
-
Optimization of hydropower reservoir system using genetic algorithm for various climatic scenarios
by: Tayebiyan, Aida
Published: (2015) -
Optimization of operations of reservoir systems for hydropower generation in Tigris River Basin, Iraq
by: Al-Aqeel, Yousif Hashim Abdullah
Published: (2016) -
Feasible study of hydroelectric power for sustainable development
by: Tan, Wilsen.
Published: (2009) -
Cooling water system of hydro power plant: A case study / Khairul Faizal Kushiar
by: Kushiar, Khairul Faizal
Published: (2009) -
Seismic performance assessment of base isolated nuclear power plants
by: Farmanbordar, Babak
Published: (2023)