The significant factors causing delay of building construction projects in Malaysia.

Purpose – The paper seeks to identify the major factors causing delay in building construction projects in Malaysia. Design/methodology/approach – A questionnaire survey was used to carry out the study. The questionnaire consisted of 31 factors which were grouped into four major categories by res...

Full description

Bibliographic Details
Main Authors: Alaghbari, Wa'el, A. Kadir, Mohd. Razali, Salim, Azizah, Mustafa Kamal, Ernawati
Format: Article
Language:English
English
Published: Emerald 2007
Online Access:http://psasir.upm.edu.my/id/eprint/18068/1/The%20significant%20factors%20causing%20delay%20of%20building%20construction%20projects%20in%20Malaysia.pdf
_version_ 1825946129609523200
author Alaghbari, Wa'el
A. Kadir, Mohd. Razali
Salim, Azizah
Mustafa Kamal, Ernawati
author_facet Alaghbari, Wa'el
A. Kadir, Mohd. Razali
Salim, Azizah
Mustafa Kamal, Ernawati
author_sort Alaghbari, Wa'el
collection UPM
description Purpose – The paper seeks to identify the major factors causing delay in building construction projects in Malaysia. Design/methodology/approach – A questionnaire survey was used to carry out the study. The questionnaire consisted of 31 factors which were grouped into four major categories by responsibility – contractor factors, owner factors, consultant factors and external factors. The level of importance of the categories was measured and the relative importance of weights was ranked. Findings – The study finds that financial problems are the main factor and coordination problems are the second most important factor causing delay in construction projects in Malaysia. The results were analyzed to rank the causes of delay and further classify the types of delay. Research limitations/implications – The scope of this study is limited to building projects in the Klang Valley area, where major Malaysian cities such as Kuala Lumpur, Putrajaya, Petaling Jaya, Shah Alam and Seremban are located. The data for this study was gathered through a detailed questionnaire survey. Originality/value – Based on the analysis of the ranking and intensity of causes of delay, this paper suggests possible improvements that could be made in order to reduce delays in the construction industry.
first_indexed 2024-03-06T07:42:15Z
format Article
id upm.eprints-18068
institution Universiti Putra Malaysia
language English
English
last_indexed 2024-03-06T07:42:15Z
publishDate 2007
publisher Emerald
record_format dspace
spelling upm.eprints-180682015-12-09T01:43:27Z http://psasir.upm.edu.my/id/eprint/18068/ The significant factors causing delay of building construction projects in Malaysia. Alaghbari, Wa'el A. Kadir, Mohd. Razali Salim, Azizah Mustafa Kamal, Ernawati Purpose – The paper seeks to identify the major factors causing delay in building construction projects in Malaysia. Design/methodology/approach – A questionnaire survey was used to carry out the study. The questionnaire consisted of 31 factors which were grouped into four major categories by responsibility – contractor factors, owner factors, consultant factors and external factors. The level of importance of the categories was measured and the relative importance of weights was ranked. Findings – The study finds that financial problems are the main factor and coordination problems are the second most important factor causing delay in construction projects in Malaysia. The results were analyzed to rank the causes of delay and further classify the types of delay. Research limitations/implications – The scope of this study is limited to building projects in the Klang Valley area, where major Malaysian cities such as Kuala Lumpur, Putrajaya, Petaling Jaya, Shah Alam and Seremban are located. The data for this study was gathered through a detailed questionnaire survey. Originality/value – Based on the analysis of the ranking and intensity of causes of delay, this paper suggests possible improvements that could be made in order to reduce delays in the construction industry. Emerald 2007 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/18068/1/The%20significant%20factors%20causing%20delay%20of%20building%20construction%20projects%20in%20Malaysia.pdf Alaghbari, Wa'el and A. Kadir, Mohd. Razali and Salim, Azizah and Mustafa Kamal, Ernawati (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14 (2). pp. 192-206. ISSN 0969-9988; ESSN: 1365-232X 10.1108/09699980710731308 English
spellingShingle Alaghbari, Wa'el
A. Kadir, Mohd. Razali
Salim, Azizah
Mustafa Kamal, Ernawati
The significant factors causing delay of building construction projects in Malaysia.
title The significant factors causing delay of building construction projects in Malaysia.
title_full The significant factors causing delay of building construction projects in Malaysia.
title_fullStr The significant factors causing delay of building construction projects in Malaysia.
title_full_unstemmed The significant factors causing delay of building construction projects in Malaysia.
title_short The significant factors causing delay of building construction projects in Malaysia.
title_sort significant factors causing delay of building construction projects in malaysia
url http://psasir.upm.edu.my/id/eprint/18068/1/The%20significant%20factors%20causing%20delay%20of%20building%20construction%20projects%20in%20Malaysia.pdf
work_keys_str_mv AT alaghbariwael thesignificantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT akadirmohdrazali thesignificantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT salimazizah thesignificantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT mustafakamalernawati thesignificantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT alaghbariwael significantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT akadirmohdrazali significantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT salimazizah significantfactorscausingdelayofbuildingconstructionprojectsinmalaysia
AT mustafakamalernawati significantfactorscausingdelayofbuildingconstructionprojectsinmalaysia