Net present value and payback period for building integrated photovoltaic projects in Malaysia
Photovoltaic systems (PV) offer a clean, alternative energy source that is very suitable in the Malaysian climate, and consistent with the peak production and high demand in power in Malaysia. However, the application of PV systems in Malaysia is still low. The objective of this research is to deter...
Main Authors: | Ong, Tze San, Chun, Hau Thum |
---|---|
Format: | Article |
Published: |
Human Resource Management Academic Research Society
2013
|
Similar Items
-
Comparing energy payback and simple payback period for solar photovoltaic systems
by: Kessler Will
Published: (2017-01-01) -
The study to optimize the payback period for PV installation in Malaysia /
by: Mohammad Shahril Ardianshah, 1984-, et al.
Published: (2009) -
PHOTOVOLTAIC EXPANSION LIMIT IN GREEN BUILDING ASSESSMENT ON LOSSES AND PAYBACK PERIOD FPR SELECTED MALAYSIAN PUBLIC HOSPITALS /
by: Mohd Effendi Amran, 1982- , author, et al.
Published: (2020) -
PHOTOVOLTAIC EXPANSION LIMIT IN GREEN BUILDING ASSESSMENT ON LOSSES AND PAYBACK PERIOD FPR SELECTED MALAYSIAN PUBLIC HOSPITALS /
by: Mohd Effendi Amran, 1982- , author, et al.
Published: (2020) -
Analysis Of Energy Consumption In Renovated Buildings And Simulation Of The Payback Period
by: Audrius Ruzgys, et al.
Published: (2013-12-01)