Dam Overtopping risk using probabilistic concepts - Case Study: The Meijaran Dam, Iran.
Hydrologic risk assessment and uncertainty analysis by mathematical and statistical methods provide useful information for decision makers. This study presents the application of risk and uncertainty analysis to dam overtopping due to various inflows and wind speeds for the Meijaran Dam in the north...
Main Authors: | Lee, Teang Shui, Goodarzi, Ehsan, Ziaei, Mina |
---|---|
Format: | Article |
Language: | English English |
Published: |
2013
|
Online Access: | http://psasir.upm.edu.my/id/eprint/28565/1/Dam%20Overtopping%20risk%20using%20probabilistic%20concepts.pdf |
Similar Items
-
Overtopping risk and uncertainty analysis of embankment dams
by: Goodarzi, Ehsan
Published: (2010) -
Alternatives for overtopping protection of dams /
by: American Society of Civil Engineers. Task Committee on Overtopping Protection
Published: (1994) -
Risk assessment of Vaniyar earth dam overtopping using system dynamics and effect of overtopping flood on the downstream lands of the dam.
by: Ali Ebrahimzadeh, et al.
Published: (2024-01-01) -
Simulated optimization of reservoir operations of the Zayandehrud dam, Iran
by: Ziaei, Mina
Published: (2010) -
Erodable dam breaching patterns due to overtopping /
by: Nor Ain Mat Lazin, 1988- author, et al.
Published: (2014)