Cab transfer process improvement at an automotive manufacturing facility

This project is related to the improvement of cab transfer process from Painted Body Storage (PBS) area to General Assembly (GA) line. The objectives of this project are to eliminate the root cause of cab defect and to streamline the transfer process with the reduction of process cycle time. From th...

Full description

Bibliographic Details
Main Authors: Kasim, Nazrul Idzham, Leman, Zulkiflle, Musa, Mohd Azam, Baharudin, B. T. Hang Tuah
Format: Article
Language:English
Published: Trans Tech Publications 2014
Online Access:http://psasir.upm.edu.my/id/eprint/36691/1/Cab%20transfer%20process%20improvement%20at%20an%20automotive%20manufacturing%20facility.pdf
_version_ 1796972968175206400
author Kasim, Nazrul Idzham
Leman, Zulkiflle
Musa, Mohd Azam
Baharudin, B. T. Hang Tuah
author_facet Kasim, Nazrul Idzham
Leman, Zulkiflle
Musa, Mohd Azam
Baharudin, B. T. Hang Tuah
author_sort Kasim, Nazrul Idzham
collection UPM
description This project is related to the improvement of cab transfer process from Painted Body Storage (PBS) area to General Assembly (GA) line. The objectives of this project are to eliminate the root cause of cab defect and to streamline the transfer process with the reduction of process cycle time. From the current process study, it is found that the lifting method causes the quality defect to the cab and the usage of different type of trolley between PBS and GA contribute to the high cycle time. The new process design has been introduced from the findings with the use of towing method and the use of common trolley for both PBS area and GA line. With the new and improved cab transfer process, the cab changing process can be eliminated. Hence, the number of operator required has been reduced, from two operators to only one operator. A trial run has been conducted with a prototype trolley and a forklift. The objectives of this project are fulfilled with the new towing method that eliminate the quality defect and the use of common trolley for both PBS and GA line resulting new cycle time of 7.13 minutes per unit from 9.77 minutes per unit. Further studies are needed for commissioning and monitoring to the new cab transfer process with the actual trolley and tow tug or buggy.
first_indexed 2024-03-06T08:36:05Z
format Article
id upm.eprints-36691
institution Universiti Putra Malaysia
language English
last_indexed 2024-03-06T08:36:05Z
publishDate 2014
publisher Trans Tech Publications
record_format dspace
spelling upm.eprints-366912016-02-12T02:35:49Z http://psasir.upm.edu.my/id/eprint/36691/ Cab transfer process improvement at an automotive manufacturing facility Kasim, Nazrul Idzham Leman, Zulkiflle Musa, Mohd Azam Baharudin, B. T. Hang Tuah This project is related to the improvement of cab transfer process from Painted Body Storage (PBS) area to General Assembly (GA) line. The objectives of this project are to eliminate the root cause of cab defect and to streamline the transfer process with the reduction of process cycle time. From the current process study, it is found that the lifting method causes the quality defect to the cab and the usage of different type of trolley between PBS and GA contribute to the high cycle time. The new process design has been introduced from the findings with the use of towing method and the use of common trolley for both PBS area and GA line. With the new and improved cab transfer process, the cab changing process can be eliminated. Hence, the number of operator required has been reduced, from two operators to only one operator. A trial run has been conducted with a prototype trolley and a forklift. The objectives of this project are fulfilled with the new towing method that eliminate the quality defect and the use of common trolley for both PBS and GA line resulting new cycle time of 7.13 minutes per unit from 9.77 minutes per unit. Further studies are needed for commissioning and monitoring to the new cab transfer process with the actual trolley and tow tug or buggy. Trans Tech Publications 2014 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/36691/1/Cab%20transfer%20process%20improvement%20at%20an%20automotive%20manufacturing%20facility.pdf Kasim, Nazrul Idzham and Leman, Zulkiflle and Musa, Mohd Azam and Baharudin, B. T. Hang Tuah (2014) Cab transfer process improvement at an automotive manufacturing facility. Applied Mechanics and Materials, 564. pp. 105-109. ISSN 1660-9336; ESSN: 1662-7482 http://www.scientific.net/AMM.564.105 10.4028/www.scientific.net/AMM.564.105
spellingShingle Kasim, Nazrul Idzham
Leman, Zulkiflle
Musa, Mohd Azam
Baharudin, B. T. Hang Tuah
Cab transfer process improvement at an automotive manufacturing facility
title Cab transfer process improvement at an automotive manufacturing facility
title_full Cab transfer process improvement at an automotive manufacturing facility
title_fullStr Cab transfer process improvement at an automotive manufacturing facility
title_full_unstemmed Cab transfer process improvement at an automotive manufacturing facility
title_short Cab transfer process improvement at an automotive manufacturing facility
title_sort cab transfer process improvement at an automotive manufacturing facility
url http://psasir.upm.edu.my/id/eprint/36691/1/Cab%20transfer%20process%20improvement%20at%20an%20automotive%20manufacturing%20facility.pdf
work_keys_str_mv AT kasimnazrulidzham cabtransferprocessimprovementatanautomotivemanufacturingfacility
AT lemanzulkiflle cabtransferprocessimprovementatanautomotivemanufacturingfacility
AT musamohdazam cabtransferprocessimprovementatanautomotivemanufacturingfacility
AT baharudinbthangtuah cabtransferprocessimprovementatanautomotivemanufacturingfacility