Monitoring aspects in EIA reports

As per the Environmental Impact Assessment Order, 1987, Malaysia, during the E.I.A study, monitoring plan needs to be proposed based on the significance of the predicted potential environmental impacts. This study reviewed monitoring aspects of 50 EIA reports prepared on several prescribed activitie...

Full description

Bibliographic Details
Main Authors: Rahman, Md. Mizanur, Daud, Mohammed, Bardaie, Mohd Zohadie, Hassan, Mohd Nasir
Format: Conference or Workshop Item
Language:English
Published: Universiti Putra Malaysia 1999
Online Access:http://psasir.upm.edu.my/id/eprint/38751/1/38751.pdf
_version_ 1796973405211197440
author Rahman, Md. Mizanur
Daud, Mohammed
Bardaie, Mohd Zohadie
Hassan, Mohd Nasir
author_facet Rahman, Md. Mizanur
Daud, Mohammed
Bardaie, Mohd Zohadie
Hassan, Mohd Nasir
author_sort Rahman, Md. Mizanur
collection UPM
description As per the Environmental Impact Assessment Order, 1987, Malaysia, during the E.I.A study, monitoring plan needs to be proposed based on the significance of the predicted potential environmental impacts. This study reviewed monitoring aspects of 50 EIA reports prepared on several prescribed activities in Malaysia. Results showed that monitoring aspects are neither properly documented nor addressed in detail. Amongst the different environmental components, monitoring of Biological and Socio-economic aspects have not been given adequate attention. Although monitoring of air and water quality are given relatively more attention, still more than 33% of the EIA reports did not propose any monitoring plan for these two vital environmental aspects. In the case of noise impacts, more than 50% of the reports did not mention about monitoring of noise. Thus, for the better environmental management of the project as well as to provide the database for environmental impact predictions in future project planning, monitoring aspects should be properly documented and addressed in detail in the EIA reports with respect to the selection of environmental parameters, frequency of monitoring, and administration of the monitored database etc.
first_indexed 2024-03-06T08:42:10Z
format Conference or Workshop Item
id upm.eprints-38751
institution Universiti Putra Malaysia
language English
last_indexed 2024-03-06T08:42:10Z
publishDate 1999
publisher Universiti Putra Malaysia
record_format dspace
spelling upm.eprints-387512017-11-02T03:38:55Z http://psasir.upm.edu.my/id/eprint/38751/ Monitoring aspects in EIA reports Rahman, Md. Mizanur Daud, Mohammed Bardaie, Mohd Zohadie Hassan, Mohd Nasir As per the Environmental Impact Assessment Order, 1987, Malaysia, during the E.I.A study, monitoring plan needs to be proposed based on the significance of the predicted potential environmental impacts. This study reviewed monitoring aspects of 50 EIA reports prepared on several prescribed activities in Malaysia. Results showed that monitoring aspects are neither properly documented nor addressed in detail. Amongst the different environmental components, monitoring of Biological and Socio-economic aspects have not been given adequate attention. Although monitoring of air and water quality are given relatively more attention, still more than 33% of the EIA reports did not propose any monitoring plan for these two vital environmental aspects. In the case of noise impacts, more than 50% of the reports did not mention about monitoring of noise. Thus, for the better environmental management of the project as well as to provide the database for environmental impact predictions in future project planning, monitoring aspects should be properly documented and addressed in detail in the EIA reports with respect to the selection of environmental parameters, frequency of monitoring, and administration of the monitored database etc. Universiti Putra Malaysia 1999 Conference or Workshop Item PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/38751/1/38751.pdf Rahman, Md. Mizanur and Daud, Mohammed and Bardaie, Mohd Zohadie and Hassan, Mohd Nasir (1999) Monitoring aspects in EIA reports. In: National Conference on Engineering Smart Farming for the Next Millenium, 14-16 Mar. 1999, UPM, Serdang, Selangor. (pp. 1-6).
spellingShingle Rahman, Md. Mizanur
Daud, Mohammed
Bardaie, Mohd Zohadie
Hassan, Mohd Nasir
Monitoring aspects in EIA reports
title Monitoring aspects in EIA reports
title_full Monitoring aspects in EIA reports
title_fullStr Monitoring aspects in EIA reports
title_full_unstemmed Monitoring aspects in EIA reports
title_short Monitoring aspects in EIA reports
title_sort monitoring aspects in eia reports
url http://psasir.upm.edu.my/id/eprint/38751/1/38751.pdf
work_keys_str_mv AT rahmanmdmizanur monitoringaspectsineiareports
AT daudmohammed monitoringaspectsineiareports
AT bardaiemohdzohadie monitoringaspectsineiareports
AT hassanmohdnasir monitoringaspectsineiareports